Storage (Duration 4h)

3 unique locations (42 components)

West Marsh Road Spalding Lincolnshire PE11 3BB (6 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
12.16 MW
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (3 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• A combined cycle gas turbine generating plant
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Active • 2024-25 (T-1), 2023-24 (T-4) ...
0.09 MW