Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

82 unique locations (327 components) - Page 2 of 4

Active MW: 3219.84 MW
Inactive MW: 0.00 MW
Poulton Power, Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 4h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Poulton Power Rejected FY6
Active • 2025-26 (T-1)
3.88 MW
Persley Croft, The Parkway, Aberdeen, AB22 8AN (1 component)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Storage (Duration 4h) PERSLEY CROFT BESS LTD New Build Generating CMU Rejected AB22
Active • 2028-29 (T-4)
19.79 MW
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified HR2
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Newton Farm Newton South Queensferry West Lothian It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post cod (6 components)
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 20MW import (2)
• Solar photovoltaic generation scheme connected to the distribution network
Solar Photovoltaic Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) ASE UK HOLDINGS LIMITED New Build Generating CMU Aithrie BESS 3 Aithrie BESS 4 +4 more Rejected EH30
Active • 2027-28 (T-4), 2026-27 (T-4)
37.87 MW
Netherton Farm, Keith AB55 5PE (14 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• Lithium ion battery storage plant
Storage (Duration 2h) Storage (Duration 4h) ZENOBE BLACKHILLOCK LIMITED New Build Generating CMU Blackhillock Blackhillock +2 more AB55
Active • 2026-27 (T-4), 2025-26 (T-1) ...
169.83 MW
LAND ON THE WEST SIDE OF MAIN ROAD, GRENDON, NORTHAMPTON, NN7 1JW. (Nearest postcode to grid reference: NN7 1JB). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 2h) Storage (Duration 4h) GRENDON STORAGE LIMITED GRENDON STORAGE LIMITED New Build Generating CMU Grendon Storage 020 Grendon Storage 043 +6 more NN7
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.44 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (11 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 4h) ENDERBY STORAGE LIMITED ENDERBY STORAGE LIMITED New Build Generating CMU Enderby Storage 019 Enderby Storage 042 +6 more LE19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.76 MW
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified EX5
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified EX1
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (5 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• 50MW battery storage located near Coalburn North 400kV substation.
• Lithium ion battery storage plant
Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h) ZENOBE COALBURN LIMITED New Build Generating CMU Coalburn unit 1 Coalburn unit 2 Not Prequalified ML11
Active • 2028-29 (T-4), 2027-28 (T-4)
114.39 MW
Land North of Goodrest Farm, Illey Lane, Hunnington, Halesowen, B62 0JL (1 component)

New Build storage facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Goodrest Farm Not Prequalified B62
Active • 2028-29 (T-4)
29.22 MW
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified RM15
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY (4 components)

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

Storage (Duration 4h) WEST BURTON C LIMITED New Build Generating CMU West Burton C BESS 1 (2024) West Burton C BESS 2 (2024) +2 more DN22
Active • 2028-29 (T-4)
208.70 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 4h) DAMSONGREEN ENERGYFARM LIMITED New Build Generating CMU Pivot Power Bramford Pivot Power Bramford +1 more IP8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.45 MW
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified IP9
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified EX34
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Land at Hammonds Drive, Eastbourne BN22 8QJ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1)
0.11 MW
Land at Exeter College Future Skills Centre, Silverdown Office Park, EX5 2LJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified EX5
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
LAND AND BUILDINGS AT, RIVERFORD FARM WELL BARN AND CADDAFORD, STAVERTON, TOTNES, TQ9 6AF. (Nearest postcode to grid reference: TQ11 0LA). (5 components)

Battery Storage Plant (3)

Storage Storage (Duration 4h) Storage (Duration 5h) Abham Storage Limited New Build Generating CMU Abham Storage Abham Storage 023 +1 more TQ9
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations