Storage (Duration 4h)

62 unique locations (294 components) - Page 2 of 3

Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.05 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (4 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• 50MW battery storage located near Coalburn North 400kV substation.
• 50MW battery storage located near to the Coalburn North 400kV substation.
Active • 2028-29 (T-4), 2027-28 (T-4)
72.65 MW
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.05 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.98 MW
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.05 MW
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.51 MW
Land at Hammonds Drive, Eastbourne BN22 8QJ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1)
0.11 MW
Land at Exeter College Future Skills Centre, Silverdown Office Park, EX5 2LJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.05 MW
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (23 components)

Lithium ion battery storage plant

Active • 2028-29 (T-4), 2026-27 (T-4)
41.74 MW
Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA (2 components)

50MW of BESS to be installed within existing Rotating Stabiliser site.

Active • 2026-27 (T-4), 2025-26 (T-4)
8.48 MW
Heysham Road, Bootle, L30 6TU (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.05 MW
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2025-26 (T-1), 2024-25 (T-1)
2.58 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (47 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
48174.56 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.82 MW
Loading map...
Showing 25 locations