Storage (Duration 4h)

85 unique locations (333 components) - Page 3 of 4

Active MW: 3219.84 MW
Inactive MW: 0.00 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (11 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 4h) ENDERBY STORAGE LIMITED ENDERBY STORAGE LIMITED New Build Generating CMU Enderby Storage 019 Enderby Storage 042 +6 more LE19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.76 MW
LAND ON THE WEST SIDE OF MAIN ROAD, GRENDON, NORTHAMPTON, NN7 1JW. (Nearest postcode to grid reference: NN7 1JB). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 2h) Storage (Duration 4h) GRENDON STORAGE LIMITED GRENDON STORAGE LIMITED New Build Generating CMU Grendon Storage 020 Grendon Storage 043 +6 more NN7
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.44 MW
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (3 components)
• New reciprocating genset in acoustic enclosure
• New containerised battery storage equipment
• New reciprocating genset in acoustic enclosure
Reciprocating engines Storage (Duration 4h) MERCIA POWER RESPONSE LIMITED New Build Generating CMU Lubenham Road MPR Lubenham Battery Conditional LE16
Inactive • 2022-23 (T-4)
Netherton Farm, Keith AB55 5PE (14 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• Lithium ion battery storage plant
Storage (Duration 2h) Storage (Duration 4h) ZENOBE BLACKHILLOCK LIMITED New Build Generating CMU Blackhillock Blackhillock +2 more AB55
Active • 2026-27 (T-4), 2025-26 (T-1) ...
169.83 MW
Newton Farm Newton South Queensferry West Lothian It is to be noted that for Grid Connection correspondence post code of EH30 9SN was used. However, the project site`s post code is yet to be identified. We will notify the DB as soon as the exact post cod (6 components)
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 20MW import (2)
• Solar photovoltaic generation scheme connected to the distribution network
Solar Photovoltaic Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) ASE UK HOLDINGS LIMITED New Build Generating CMU Aithrie BESS 3 Aithrie BESS 4 +4 more Rejected EH30
Active • 2027-28 (T-4), 2026-27 (T-4)
37.87 MW
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Old Trimpell Refinery Site Middleton Road Middleton Heysham LA3 3NT (2 components)

24 x 2MW battery storage units to be installed on designated land within a manufacturing compound on the Old Trimpell Refinery site. (2)

Storage (Duration 4h) Lancaster Power Limited New Build Generating CMU LancPowerStorage01 LancPowerStorage01 Not Prequalified LA3
Inactive • 2023-24 (T-4), 2022-23 (T-4)
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified HR2
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Persley Croft, The Parkway, Aberdeen, AB22 8AN (1 component)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Storage (Duration 4h) PERSLEY CROFT BESS LTD New Build Generating CMU Rejected AB22
Active • 2028-29 (T-4)
19.79 MW
Poulton Power, Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 4h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Poulton Power Rejected FY6
Active • 2025-26 (T-1)
3.88 MW
Saint Mary's Lane, Monks Farm, London Borough of Havering, London, Thurrock, Greater London, England, CM13 3EL, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Storage (Duration 4h) CSE26 Limited New Build Generating CMU Warley26 Not Prequalified CM13
Active • 2027-28 (T-4)
61.25 MW
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (1 component)

New Build Battery Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Scalm Park Not Prequalified YO8
Active • 2028-29 (T-4)
16.70 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.76 MW
Selby, North Yorkshire, YO8 6PG (2 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Greenacres Greenacres 2 YO8
Active • 2028-29 (T-4)
25.07 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (2 components)

BESS project to be installed within a future Greener Grid Park.

Storage (Duration 4h) STATKRAFT UK LTD New Build Generating CMU Not Prequalified PA2
Active • 2028-29 (T-4)
268.39 MW
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified SS7
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Sewage Treatment Works, Chelmsford Road, Dunmow, CM6 1XG (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CM6
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CO4
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (1 component)

New Build Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Spring Lane Not Prequalified NG4
Active • 2028-29 (T-4)
37.57 MW
Station Rd, Clowne, Chesterfield S43 4AB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Stephenson Road, Colchester Business Park, CO4 9QP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CO4
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CM7
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (2 components)

BESS project to be installed within a future Greener Grid Park. (2)

Storage (Duration 4h) STATKRAFT UK LTD BALWEN LIMITED New Build Generating CMU THOR-2 YO42
Active • 2028-29 (T-4), 2025-26 (T-1)
88.23 MW
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (10 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Storage (Duration 4h) THORPE MARSH GREEN ENERGY HUB LIMITED New Build Generating CMU Thorpe Marsh BESS 1 (2024) Thorpe Marsh BESS 10 (2024) +8 more Not Prequalified DN6
Active • 2028-29 (T-4)
584.36 MW
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code see cover letter) (1 component) Geocoding Needed

49MW 4 hr BESS

Storage (Duration 4h) BALWEN LIMITED New Build Generating CMU
Active • 2026-27 (T-4)
22.88 MW
Loading map...
Showing 25 locations