Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

82 unique locations (327 components) - Page 3 of 4

Active MW: 3219.84 MW
Inactive MW: 0.00 MW
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified LN1
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (22 components)

Lithium ion battery storage plant (2)

Storage (Duration 4h) SPECTRUMRESERVE LTD New Build Generating CMU Not Prequalified FK10
Active • 2028-29 (T-4), 2026-27 (T-4)
170.15 MW
Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA (2 components)

50MW of BESS to be installed within existing Rotating Stabiliser site. (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
8.48 MW
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 component)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Storage (Duration 4h) Hollybush BESS Ltd New Build Generating CMU Lando WV5
Active • 2028-29 (T-4)
7.93 MW
Heysham Road, Bootle, L30 6TU (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified L30
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 4h) Storage (Duration 3.5h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Glowhouse Power Glowhouse Power Rejected PR26
Active • 2025-26 (T-1), 2024-25 (T-1)
4.48 MW
Fibden Farm, Hampton Lovett, Droitwich, Worcestershire, WR9 0NA (1 component)

New Build Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Fibden Farm Not Prequalified WR9
Active • 2028-29 (T-4)
16.70 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (45 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Eccles Birgham Farm, TD12 4LU. (1 component)

Lithium ion battery storage plant.

Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Kilmarnock South unit 3 TD12
Active • 2027-28 (T-4)
15.39 MW
Eccles Birgham Farm, TD12 4LU (2 components)
• Lithium ion battery storage plant
• Lithium ion battery storage plant.
Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Kilmarnock South unit 1 Kilmarnock South unit 2 TD12
Active • 2027-28 (T-4)
30.78 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Blackhillock extension Eccles +4 more TD12
Active • 2027-28 (T-4), 2026-27 (T-4)
171.47 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)

12 MW Connection 48 MWh Distribution unit (2)

Storage (Duration 4h) DRAGONS LANE BATTERY STORAGE LIMITED New Build Generating CMU Dragon Lane CW11
Active • 2026-27 (T-4), 2023-24 (T-1)
12.98 MW
Dounreay, Thurso KW14 7RE (2 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) REAY POWER LIMITED New Build Generating CMU Reay Reay 2 Rejected KW14
Active • 2028-29 (T-4)
21.31 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Dellsome Power Dellsome Power +1 more AL4
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.57 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available. Please see the cover letter for more det (4 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4)
32.89 MW
Coal Aston, Dronfield, S18 3AA (2 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Dyche Lane Dyche Lane 2 Not Prequalified S18
Active • 2028-29 (T-4)
28.21 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (1 component)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Storage (Duration 4h) CIRENCESTER SOLAR FARM LTD New Build Generating CMU Cirencester Solar Farm GL7
Active • 2025-26 (T-4)
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (3 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (3)

Storage (Duration 4h) CIRENCESTER SOLAR FARM LTD New Build Generating CMU Cirencester Solar Farm Cirencester Solar Farm GL7
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.69 MW
Loading map...
Showing 25 locations