Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

82 unique locations (327 components) - Page 4 of 4

Active MW: 3219.84 MW
Inactive MW: 0.00 MW
Buxton Road BESS, Wormhill, Dove Holes, High Peak, Derbyshire, SK17 8DL (1 component)

New Build Battery Storage

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Buxton Road Not Prequalified SK17
Active • 2028-29 (T-4)
7.51 MW
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Storage (Duration 4h) CSE33 Limited New Build Generating CMU Bramford33 Rejected IP8
Active • 2027-28 (T-4)
122.81 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1)
0.11 MW
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified MK15
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Storage (Duration 2h) Storage (Duration 4h) Zenobe Stalybridge Limited New Build Generating CMU Stalybridge Stalybridge Not Prequalified SK15
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
adjacent to Kilmarnock South Substation KA1 3TN (12 components)

Lithium ion battery storage plant (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
150.05 MW
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build Generating CMU comprising of a battery storage asset (2)
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 3h) Storage (Duration 4h) CONRAD (DUNKESWELL) LIMITED New Build Generating CMU Dunkeswell Dunkeswell +3 more EX14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 7 locations