Storage (Duration 5h)

1 unique locations (12 components)

132 Manchester Road, Carrington, Manchester, M31 4AY (12 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2021-22 (T-4), 2022-23 (T-4) ...
1761.93 MW