Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 8h)

10 unique locations (383 components)

WA10 (53 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
48.93 MW
ROXBOROUGH AVENUE ISLEWORTH MIDDLESEX TW7 (3 components)
• A Battery Energy Storage System.
• Domestic EV charger
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Active • 2028-29 (T-4), 2025-26 (T-4) ...
44.13 MW
PERRYFIELD WAY RICHMOND SURREY TW10 (3 components)
• A Battery Energy Storage System.
• Bridgwater Somerset. New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. Auxiliary load will be fed from before the metering and is therefore taken into account when delivering.
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-4) ...
49.74 MW
M26 (46 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-1) ...
53.48 MW
Lucas Avenue Chelmsford Essex CM2 (3 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build BESS to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
15.28 MW
GARBUTTS LANE HUTTON RUDBY YARM TS15 (3 components)
• A Battery Energy Storage System.
• Baldock Road, Letchworth, Hertfordshire, SG6 1UP
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-4) ...
62.85 MW
EH53 (59 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
99.33 MW
CW8 (151 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
336.51 MW
CEDAR ROAD WEYBRIDGE SURREY KT13 (3 components)
• A Battery Energy Storage System.
• Domestic EV charger
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Active • 2028-29 (T-4), 2025-26 (T-4) ...
44.13 MW
CB11 (59 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
96.21 MW
Loading map...
Showing 10 locations