Storage (Duration 9h)

4 unique locations (10 components)

Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)

This is a 49.9MW battery storage facility connected at 33kV.

Active • 2027-28 (T-4), 2025-26 (T-1)
7.90 MW
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (2 components)

Standalone battery storage system connecting at 33kV to the Broxburn substation

Active • 2027-28 (T-4), 2025-26 (T-1)
6.58 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.04 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY (2 components)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Active • 2027-28 (T-4), 2025-26 (T-1)
6.58 MW
Loading map...
Showing 4 locations