Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 9h)

2 unique locations (11 components)

Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components)

Lithium-based battery energy storage system.

Active • 2027-28 (T-4), 2026-27 (T-4)
16.74 MW
Loading map...
Showing 2 locations