Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 9h)

9 unique locations (164 components)

Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
Pilsworth Rd, Heywood OL10, UK (1 component)

BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)

Active • 2027-28 (T-4)
283.77 MW
National Grid Grain LNG Importation Terminal Isle of Grain Kent ME3 0AB (1 component)

BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)

Active • 2028-29 (T-4)
280.21 MW
Lochaber Smelter, Fort William, PH33 6TH (3 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Metal smelting site
Active • 2028-29 (T-4), 2017-18 (TR)
279.16 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (56 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Building 8, Chiswick Park, 566 Chiswick High Road, London W4 5XU (6 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Standby generation
Active • 2027-28 (T-4), 2020-21 (T-4) ...
283.30 MW
Adsworth Road, Stockport, SK3 8LF (3 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2021-22 (T-1)
286.85 MW
120 London Wall, London EC2Y 5ET (3 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• This is an office building with large chillings
Active • 2028-29 (T-4), 2017-18 (TR)
279.31 MW
Loading map...
Showing 9 locations