Storage (Duration 9h)

2 unique locations (23 components)

TN31 (20 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
35.06 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (3 components)

New build BESS to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4), 2027-28 (T-4)
80.51 MW
Loading map...
Showing 2 locations