Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 9h)

17 unique locations (203 components)

120 London Wall, London EC2Y 5ET (3 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• This is an office building with large chillings
Active • 2028-29 (T-4), 2017-18 (TR)
279.31 MW
Adsworth Road, Stockport, SK3 8LF (3 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2021-22 (T-1)
286.85 MW
Building 8, Chiswick Park, 566 Chiswick High Road, London W4 5XU (6 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Standby generation
Active • 2027-28 (T-4), 2020-21 (T-4) ...
283.30 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.50 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.38 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (56 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (16 components)
• Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant
• Generating Unit 1
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
603.34 MW
Land At Drum Farm Keith Moray AB55 5NP (1 component)

Battery storage CMU

Active • 2027-28 (T-4)
9.06 MW
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (1 component)

Lithium-based battery energy storage system.

Active • 2027-28 (T-4)
7.85 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
23.28 MW
Lochaber Smelter, Fort William, PH33 6TH (3 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Metal smelting site
Active • 2028-29 (T-4), 2017-18 (TR)
279.16 MW
National Grid Grain LNG Importation Terminal Isle of Grain Kent ME3 0AB (1 component)

BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)

Active • 2028-29 (T-4)
280.21 MW
Pilsworth Rd, Heywood OL10, UK (1 component)

BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)

Active • 2027-28 (T-4)
283.77 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
Loading map...
Showing 17 locations