Storage (Duration 0.5h)

23 unique locations (174 components)

Woodend Farm, Bigrigg, Cumbria, CA22 2TA (11 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (29 components)
• West Burton B Power Station CMU 1 WB1-16= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-17= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-21= 100% T_WBURB-1
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3608.42 MW
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (7 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (13 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Rufford Colliery Lane, Rainworth, Mansfield, Nottinghamshire, UK, NG21 0HR (3 components)

battery storage with other generation

Inactive • 2019-20 (T-1)
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (5 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (2 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (7 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (19 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
2.60 MW
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Lower Road, Brentwood, CM13 1BZ (1 component)

Advanced battery energy storage system

Inactive • 2019-20 (T-1)
Land at Lookabootye Broxburn West Lothian EH52 5PD (7 components)
• New build battery
• Operational battery
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Land at Lookabootye Broxburn West Lothian EH52 5PD (3 components)
• New build battery
• Operational battery
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (3 components)
• New build battery
• Operational battery
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (2 components)
• New build battery
• Operational battery
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (13 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Carnegie Road, Liverpool, L13 7HY. (5 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (7 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Amersham Road Denham Buckinghamshire SL9 7AW (7 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
27.86 MW
Amersham Road Denham Buckinghamshire SL9 7AW (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
3.01 MW
Albion Road, Dartford, Kent, DA1 5PZ (13 components)

battery storage (3)

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
37.65 MW
Loading map...
Showing 23 locations