Storage (Duration 0.5h)

5 unique locations (5 components)

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
Land Adjacent to Braintree Substation, Braintree 400kV substation, Braintree Road, Cressing, CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
7.34 MW
Land Adjacent to Norwich Substation Mangreen Lane Stoke Holy Cross Norwich NR14 8PG (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Norwich Conditional NR14
Inactive • 2022-23 (T-4)
Land Adjacent to Norwich Substation, Mangreen Lane, Stoke Holy Cross, Norwich, NR14 8PG (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
7.34 MW
Land Adjacent to Nursling Substation, Station Road, Nursling, Southampton, SO16 0AH (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
7.34 MW
7.34 MW
Loading map...
Showing 5 locations