Storage (Duration 0.5h)

6 unique locations (49 components)

Active MW: 2372.71 MW
Inactive MW: 55.35 MW
Carnegie Road, Liverpool, L13 7HY (1 component)

The CMU comprises lithium ion batteries housed in ISO containers used to house the converters

Storage (Duration 0.5h) ORSTED ESS MERSEY LIMITED Existing Generating CMU Carnegie Road CMU Rejected L13
Active • 2025-26 (T-1)
1.36 MW
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)

49.99MW Lithium-ion Energy Storage System (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.97 MW
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Hawthorne Road Hawthorne Road New Build Generating CMU +1 more Not Prequalified L20
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (8 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (2)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
Storage Storage (Duration 2h) Storage (Duration 0.5h) NEVENDON ENERGY STORAGE LTD New Build Generating CMU Nevendon Battery Storage Nevendon Battery Storage +2 more SS14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.46 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (12 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.10 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +17 more DN22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3608.42 MW
Loading map...
Showing 6 locations