Storage (Duration 0.5h)

34 unique locations (92 components) - Page 1 of 2

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (4 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Battery Storage Storage (Duration 0.5h) CLEATOR BATTERY STORAGE LIMITED New Build Generating CMU Cleator Storage Cleator Storage +1 more CA22
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
13.51 MW
Thames Water Sewage Treatment Works, Ducklington Lane, Witney, OX28 5JH (2 components) Geocoding Needed

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
6.56 MW
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components) Geocoding Needed

battery storage

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA BS7
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
16.49 MW
Stanstead Abbots, Ware, Hertfordshire, SG12 8JY (3 components) Geocoding Needed

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
25.39 MW
Rufford Colliery Lane, Rainworth, Mansfield, Nottinghamshire, UK, NG21 0HR (1 component) Geocoding Needed

battery storage with other generation

Storage (Duration 0.5h) HC ESS2 LIMITED Existing Generating CMU ALPHA NG21
Inactive • 2019-20 (T-1)
5.25 MW
Roundponds Farm, Shurnold, Melksham, Wiltshire, SN12 8DF (3 components) Geocoding Needed
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
9.44 MW
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (2 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Storage Storage (Duration 0.5h) Roundponds Energy Limited Existing Generating CMU Roundponds Storage 1 Roundponds Storage 1 SN12
Inactive • 2019-20 (T-1), 2018-19 (T-1)
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components) Geocoding Needed

NEW BUILD BATTERY STORAGE STATION

Storage Storage (Duration 0.5h) ROSSIDE ENERGY LIMITED New Build Generating CMU ROS ROS Conditional LA12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
3.08 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA13 0PQ (3 components) Geocoding Needed

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
67.43 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

Storage Battery Storage Storage (Duration 0.5h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Roosecote EFR Roosecote EFR +1 more LA13
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components) Geocoding Needed

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
8.75 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) VATTENFALL WIND POWER LTD Existing Generating CMU Battery@PyC Battery@PyC +1 more CF42
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Lower Road, Brentwood, CM13 1BZ (2 components) Geocoding Needed
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
3.54 MW
Lower Road, Brentwood, CM13 1BZ (1 component)

Advanced battery energy storage system

Storage (Duration 0.5h) OSSPV001 LIMITED New Build Generating CMU OSL002 CM13
Inactive • 2019-20 (T-1)
Land to the West of Harker Grid Sub Station, Low Harker, Harker, Carlisle, CA6 4DQ (1 component) Geocoding Needed

New build transmission connected battery storage site

Inactive • 2022-23 (T-4)
7.34 MW
LAND NORTH OF PELHAM SUBSTATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP?S STORTFORD, CM23 1BA (Nearest Postcode to grid reference: SG90JB) (2 components)

Battery Storage Plant (2)

Storage Storage (Duration 0.5h) PELHAM STORAGE LIMITED Existing Generating CMU Pelham Storage 027 Pelham Storage 053 CM23
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land North Of Oaklands Park Lane Cottingham East Riding Of Yorkshire, HU16 5RX (Nearrest postcode to grid reference: HU16 5SB) (2 components) Geocoding Needed

Battery Storage Plant

Storage Storage (Duration 0.5h) CREYKE BECK STORAGE LIMITED New Build Generating CMU Creyke Beck Storage 026 Creyke Beck Storage 052 HU16
Inactive • 2019-20 (T-1), 2018-19 (T-1)
19.40 MW
Land at Lookabootye, Broxburn, West Lothian, EH52 5PD (4 components) Geocoding Needed
• New build battery
• Operational battery
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
6.90 MW
Land at Lookabootye Broxburn West Lothian EH52 5PD (3 components)
• Operational battery (2)
• New build battery
Storage Storage (Duration 0.5h) UK ENERGY STORAGE SERVICES LIMITED New Build Generating CMU Broxburn Energy Storage Broxburn Energy Storage EH52
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Land at Jarrow Slake, Port of Tyne, Adjacent to Jarrow Road, South Shields, NE34 9PS (2 components) Geocoding Needed
• New build battery
• Operational battery
Inactive • 2019-20 (T-1), 2018-19 (T-1)
13.59 MW
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (2 components)
• New build battery
• Operational battery
Storage Storage (Duration 0.5h) SOUTH SHIELDS ENERGY STORAGE LTD Existing Generating CMU Port of Tyne Energy Storage Port of Tyne Energy Storage NE34
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Battery Storage Storage (Duration 0.5h) GLASSENBURY BATTERY STORAGE LIMITED New Build Generating CMU Glassenbury Storage Glassenbury Storage +2 more TN17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
55.99 MW
Land Adjacent to Nursling Substation, Station Road, Nursling, Southampton, SO16 0AH (1 component) Geocoding Needed

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
7.34 MW
Land Adjacent to Norwich Substation, Mangreen Lane, Stoke Holy Cross, Norwich, NR14 8PG (1 component) Geocoding Needed

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
7.34 MW
Loading map...
Showing 25 locations