Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 0.5h)

34 unique locations (92 components) - Page 2 of 2

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA13 0PQ (3 components) Geocoding Needed

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
67.43 MW
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components) Geocoding Needed

NEW BUILD BATTERY STORAGE STATION

Storage Storage (Duration 0.5h) ROSSIDE ENERGY LIMITED New Build Generating CMU ROS ROS Conditional LA12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
3.08 MW
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (2 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Storage Storage (Duration 0.5h) Roundponds Energy Limited Existing Generating CMU Roundponds Storage 1 Roundponds Storage 1 SN12
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Roundponds Farm, Shurnold, Melksham, Wiltshire, SN12 8DF (3 components) Geocoding Needed
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
9.44 MW
Rufford Colliery Lane, Rainworth, Mansfield, Nottinghamshire, UK, NG21 0HR (1 component) Geocoding Needed

battery storage with other generation

Storage (Duration 0.5h) HC ESS2 LIMITED Existing Generating CMU ALPHA NG21
Inactive • 2019-20 (T-1)
5.25 MW
Stanstead Abbots, Ware, Hertfordshire, SG12 8JY (3 components) Geocoding Needed

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
25.39 MW
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components) Geocoding Needed

battery storage

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA BS7
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
16.49 MW
Thames Water Sewage Treatment Works, Ducklington Lane, Witney, OX28 5JH (2 components) Geocoding Needed

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
6.56 MW
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (4 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Battery Storage Storage (Duration 0.5h) CLEATOR BATTERY STORAGE LIMITED New Build Generating CMU Cleator Storage Cleator Storage +1 more CA22
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
13.51 MW
Loading map...
Showing 9 locations