Storage (Duration 0.5h)

34 unique locations (92 components) - Page 2 of 2

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
Land Adjacent to Norwich Substation Mangreen Lane Stoke Holy Cross Norwich NR14 8PG (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Norwich Conditional NR14
Inactive • 2022-23 (T-4)
Land Adjacent to Braintree Substation, Braintree 400kV substation, Braintree Road, Cressing, CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
7.34 MW
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Gateway Crescent New Build Generating CMU Gateway Crescent New Build Generating CMU Conditional OL9
Inactive • 2022-23 (T-4), 2021-22 (T-4)
6.56 MW
Carnegie Road, Liverpool, L13 7HY. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage Storage (Duration 0.5h) ORSTED ESS MERSEY LIMITED New Build Generating CMU Carnegie Road New Build Generating CMU Carnegie Road New Build Generating CMU L13
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.82 MW
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Storage Storage (Duration 0.5h) E.ON UK CHP LIMITED New Build Generating CMU Blackburn Meadows Battery Blackburn Meadows Battery +1 more S9
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
13.51 MW
Amersham Road, Denham, Buckinghamshire, SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.38 MW
Amersham Road Denham Buckinghamshire SL9 7AW (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Storage Storage (Duration 0.5h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Peak Gen Power 27 Conditional SL9
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Albion Road, Dartford, Kent, DA1 5PZ (6 components)

battery storage

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA DA1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
16.49 MW
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)

The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready …

Storage Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Arkwright Road New Build Generating CMU Arkwright Road New Build Generating CMU Conditional WA7
Inactive • 2022-23 (T-4), 2021-22 (T-4)
6.56 MW