Storage (Duration 0.5h)

30 unique locations (148 components) - Page 1 of 2

Woodend Farm, Bigrigg, Cumbria, CA22 2TA (11 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (7 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Rufford Colliery Lane, Rainworth, Mansfield, Nottinghamshire, UK, NG21 0HR (3 components)

battery storage with other generation

Inactive • 2019-20 (T-1)
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (5 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (2 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2019-20 (T-1), 2018-19 (T-1)
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (3 components)

NEW BUILD BATTERY STORAGE STATION

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (7 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (19 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
2.60 MW
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Lower Road, Brentwood, CM13 1BZ (1 component)

Advanced battery energy storage system

Inactive • 2019-20 (T-1)
Land to the West of Harker Grid Sub Station Low Harker Harker Carlisle CA6 4DQ (1 component)

New build transmission connected battery storage site

Inactive • 2022-23 (T-4)
Land at Lookabootye Broxburn West Lothian EH52 5PD (7 components)
• New build battery
• Operational battery
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Land at Lookabootye Broxburn West Lothian EH52 5PD (3 components)
• New build battery
• Operational battery
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (3 components)
• New build battery
• Operational battery
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (2 components)
• New build battery
• Operational battery
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (13 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land Adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
Land Adjacent to Norwich Substation Mangreen Lane Stoke Holy Cross Norwich NR14 8PG (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
Land Adjacent to Braintree Substation Braintree 400kV substation Braintree Road Cressing CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Carnegie Road, Liverpool, L13 7HY. (5 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations