Storage (Duration 1.5h)

17 unique locations (108 components)

Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (20 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.42 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (14 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
71.09 MW
Netherlands Way, Stallingborough, DN41 8DF (2 components)

New build battery storage facility

Active • 2026-27 (T-4)
14.22 MW
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (3 components)
• A 49.9 Energy Storage System
• A Lithium Ion Battery Energy Storage System
• A Lithium Ion Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1)
35.25 MW
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours

Active • 2027-28 (T-4), 2026-27 (T-4)
7.32 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (2 components)
• A new build 99.9MW battery energy storage system
• A new build battery energy storage system
Active • 2028-29 (T-4), 2026-27 (T-4)
33.46 MW
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (3 components)
• New Build 99.9 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
40.17 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (2 components)

Lithium-based battery energy storage system

Active • 2026-27 (T-4), 2025-26 (T-1)
17.92 MW
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (1 component)

New Build 25 MW Battery Energy Storage system

Active • 2026-27 (T-4)
4.44 MW
Land at West Road, Trafford Park, M41 7SW (8 components)
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
• Battery Storage Station
Active • 2026-27 (T-4), 2025-26 (T-1) ...
14.35 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (17 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Active • 2026-27 (T-4), 2025-26 (T-4) ...
156.98 MW
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (3 components)

This is a 99.9MW battery storage facility connected at 132kV.

Active • 2026-27 (T-4), 2025-26 (T-1)
61.13 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (5 components)

49.9MW Lithium-ion Energy Storage System

Active • 2026-27 (T-4), 2024-25 (T-1) ...
42.37 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (1 component)

New build 1.5 hour duration battery storage

Active • 2026-27 (T-4)
1.60 MW
Blandford Road, Poole, BH16 6AB (6 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
41.55 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (17 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
55.97 MW
Loading map...
Showing 17 locations