Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

16 unique locations (37 components)

Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
• 3 x 2MW gas gen sets
• Battery Storage Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.19 MW
Richborough Energy Park, Ramsgate Road, Sandwich, England CT13 9NL (2 components)

New Build Battery Energy Storage System

Active • 2028-29 (T-4)
54.74 MW
Minchens Lane Bramley RG7 2NL (3 components)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
22.12 MW
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (3 components)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
24.54 MW
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER (1 component)

A 120.000 MW / 180.000 MWh battery energy storage system

Active • 2028-29 (T-4)
18.92 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (2 components)
• A new build 99.9MW battery energy storage system
• A new build battery energy storage system
Active • 2028-29 (T-4), 2026-27 (T-4)
33.46 MW
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (4 components)

A 100.000 MW / 150.000 MWh battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
54.58 MW
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (1 component)

A 47.500 MW / 71.250 MWh battery energy storage system

Active • 2028-29 (T-4)
7.49 MW
Land east of Nailcote Farm, Burton Green, Berkswell, Coventry, CV7 7DE (2 components)

49.9MW lithium ion battery energy storage located at Berkswell near Coventry

Active • 2028-29 (T-4)
15.74 MW
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
16.07 MW
Kilwinning, North Ayrshire, Scotland, KA13 7RU, United Kingdom (2 components)

Battery energy storage system

Active • 2028-29 (T-4)
9.42 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components)
• An 87.500 MW Battery Storage Site Component.
• An 87.500 MW New Build Battery Storage Site Component
• An 87.500 MW New Build Battery Storage Site Component.
Active • 2028-29 (T-4)
55.20 MW
Blackford, Aberdeenshire, AB51 8YN (2 components)

A 50MW New Build Battery Storage Site

Active • 2028-29 (T-4)
15.77 MW
Atcost Road, Barking Riverside, London, England, IG11 0EQ (2 components)

Battery energy storage system

Active • 2028-29 (T-4)
25.74 MW
15.46 MW
Loading map...
Showing 16 locations