Storage (Duration 1h)

17 unique locations (55 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)

Battery Energy Storage System (2)

Storage (Duration 1h) KIWI POWER LTD New Build Generating CMU Rejected L38
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Storage Storage (Duration 1h) SIGBAT D LIMITED New Build Generating CMU UKER31 UKER33 +2 more Not Prequalified WN1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Breck Road, Wallasey, Liverpool (2 components) Geocoding Needed

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation. (2)

Storage Storage (Duration 1h) ORSTED BURBO (UK) LIMITED New Build Generating CMU Burbo Battery Burbo Battery
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU KnotKirkThry WF11
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Cleveland Potash ICL UK Boulby Mine Loftus Saltburn TS13 4UZ (2 components)

6MW BESS (2)

Storage Storage (Duration 1h) KIWI POWER LTD Existing Generating CMU Cleveland TS13
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Gateshead Local Environmental Services, Park Road, Gateshead, NE8 3HN (3 components)

Battery storage (3)

Storage Storage (Duration 1h) BRITISH GAS TRADING LIMITED New Build Generating CMU Gateshead Battery Storage NE8
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
J3 Business Park Balby Carr End Doncaster DN4 8DE (2 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Storage Storage (Duration 1h) Limejump Virtual 5 Limited New Build Generating CMU Doncaster Balby Doncaster Balby DN4
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (1 component)

A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring …

Storage (Duration 1h) ENERGY STORE 6 LTD New Build Generating CMU York Energy Centre Conditional YO61
Inactive • 2019-20 (T-1)
Land at Burnley Road Simonstone BB12 7ND (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage (Duration 1h) SIGBAT B LIMITED New Build Generating CMU UKER30 UKER76 +2 more Rejected BB12
Inactive • 2019-20 (T-1)
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.

Storage (Duration 1h) ENERGY STORE 4 LTD New Build Generating CMU Hull Energy Centre Conditional HU11
Inactive • 2019-20 (T-1)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)

Storage Storage (Duration 1h) SOUTH EAST GRID STORAGE TWO LTD New Build Generating CMU Rayleigh Battery Storage Facility Rayleigh Battery Storage Facility Rejected SS6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)

Storage Storage (Duration 1h) RNK Holding Ltd New Build Generating CMU Ipsley Battery Storage Facility Ipsley Battery Storage Facility Conditional B98
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (4 components)

7 MW of Battery Storage located at Grantham. (3)

Storage Storage (Duration 1h) Limejump Virtual 1 Limited Existing Generating CMU Mill Farm MillFarm1 +2 more NG32
Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Milton Court Farm, Dorking, RH4 3LY (5 components)
• 6MW battery energy storage facility at Milton Court Farm, Dorking (2)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
Storage Battery Storage Storage (Duration 1h) GBSL DORKING LIMITED New Build Generating CMU GBSL Dorking GBSL Dorking +1 more RH4
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region. (2)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
Storage Storage (Duration 1h) Ecotricity Generation Limited New Build Generating CMU Alveston Battery Storage Alveston Battery Storage Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Sub station Percival Lane Runcorn Cheshire WA7 4DS (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

Storage (Duration 1h) SIGBAT F LIMITED New Build Generating CMU UKER75 UKER77 WA7
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Loading map...
Showing 17 locations