Storage (Duration 1h)

6 unique locations (83 components)

Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (12 components)

Battery Energy Storage System

Inactive • 2019-20 (T-1), 2020-21 (T-1) ...
6.24 MW
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (16 components)
• 49.900MW Battery Energy Storage System
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
Inactive • 2020-21 (T-1), 2021-22 (T-1) ...
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (18 components)
• Battery Energy Storage System located at Minety
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
Inactive • 2020-21 (T-1), 2021-22 (T-1) ...
12.33 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2020-21 (T-1), 2022-23 (T-3) ...
7.10 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (19 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2019-20 (T-1), 2020-21 (T-1) ...
7.30 MW
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (12 components)

2MW BESS

Inactive • 2018-19 (T-1), 2019-20 (T-1) ...
Loading map...
Showing 6 locations