Storage (Duration 1h)

15 unique locations (89 components)

West Road Prenton Merseyside CH43 (2 components)
• 7 MW of Battery Storage located at Grantham.
• Domestic EV charger
Active • 2025-26 (T-4), 2020-21 (T-1)
Triggs Mead Wallingford OX10 (2 components)
• Battery Energy Storage System
• EV charging at residential premises
Inactive • 2023-24 (T-1), 2020-21 (T-1)
The Fields Hoo ROCHESTER ME3 (3 components)
• Domestic EV charger
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
Active • 2025-26 (T-4), 2020-21 (T-1) ...
The Bridle Path Epsom Surrey KT17 (1 component)

A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

Inactive • 2020-21 (T-1)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (19 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
3.91 MW
MORAN CLOSE WILMSLOW CHESHIRE SK9 (3 components)
• 1 x OCGT
• Domestic EV charger
• The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system (NOT containerised). The MV transformers and Power Conversion Systems (Inverters) will be installed in ISO containers positioned outside the warehouse in the yard area.
Active • 2025-26 (T-4), 2023-24 (T-1) ...
3.72 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.10 MW
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (18 components)
• Battery Energy Storage System located at Minety
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
12.33 MW
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (16 components)
• 49.900MW Battery Energy Storage System
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
HYMERS CLOSE BRANDESBURTON DRIFFIELD YO25 (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2020-21 (T-1)
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (1 component)
• Cottam Power Station Combined CMU CTC-19 = 100% (T_COTPS-1) + 100% (T_COTPS-2)+ 100% (T_COTPS-3) +100% (T_COTPS-4) +100% (T_COTPS-S) Component T_COTPS-1 = 100% (T_COTPS-1) +25%(T_COTPS-S)
• Cottam Power Station Combined CMU CTC-19 = 100% (T_COTPS-1) + 100% (T_COTPS-2)+ 100% (T_COTPS-3) +100% (T_COTPS-4) +100% (T_COTPS-S) Component T_COTPS-2 = 100% (T_COTPS-2) +25%(T_COTPS-S)
• Cottam Power Station Combined CMU CTC-19 = 100% (T_COTPS-1) + 100% (T_COTPS-2)+ 100% (T_COTPS-3) +100% (T_COTPS-4) +100% (T_COTPS-S) Component T_COTPS-3 = 100% (T_COTPS-3) +25%(T_COTPS-S)
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
1528.52 MW
DRIFTERS DRIVE DEEPCUT CAMBERLEY SURREY GU16 (1 component)

Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.

Inactive • 2020-21 (T-1)
Crofts Road Harrow HA1 (3 components)
• 2MW BESS
• Domestic EV charger
• EV charging at residential premises
Active • 2025-26 (T-4), 2023-24 (T-1) ...
7.01 MW
BODDINGTON ROAD DAVENTRY NN11 (1 component)

49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire

Inactive • 2020-21 (T-1)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (12 components)

Battery Energy Storage System

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
6.24 MW
Loading map...