Storage (Duration 1h)

70 unique locations (675 components) - Page 1 of 3

1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Active • 2021-22 (T-4), 2022-23 (T-3) ...
2.14 MW
Albion Road, Dartford, Kent, UK, DA1 5PZ (9 components)
• A 2.5MW New Build Battery Storage System
• A New Build 2.5MW Generation Battery Site
• A New Build Generation Battery Site
Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
1.07 MW
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (4 components)

Battery Energy Storage System

Inactive • 2019-20 (T-1), 2022-23 (T-4)
Back Lane, Chesterfield, S44 5XQ (14 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2022-23 (T-1), 2022-23 (T-3) ...
11.16 MW
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (12 components)

Battery Energy Storage System

Inactive • 2019-20 (T-1), 2020-21 (T-1) ...
6.24 MW
Boots, DD8 3BS (9 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2021-22 (T-4), 2022-23 (T-3) ...
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (16 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2022-23 (T-3), 2022-23 (T-4) ...
10.35 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (14 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2019-20 (T-1), 2021-22 (T-1) ...
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (16 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2022-23 (T-3), 2022-23 (T-4) ...
4.27 MW
Church Bottom, Salisbury, SP4 6NN (3 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
Inactive • 2022-23 (T-4)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (11 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2019-20 (T-1), 2021-22 (T-1) ...
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (18 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2022-23 (T-3), 2022-23 (T-4) ...
91.05 MW
Crossways, Greenhithe, DA9 9BB (3 components)
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
• A Battery Energy Storage System.
Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System
Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (10 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (18 components)
• A new Build Generating Storage CMU
• Existing Generating Storage CMU
Inactive • 2021-22 (T-4), 2022-23 (T-1) ...
10.68 MW
66.82 MW
Hulley Road Macclesfield Cheshire SK10 2LP (1 component)

20.000 MW of battery storage located at Macclesfield

Inactive • 2022-23 (T-4)
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 component)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4)
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (7 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2018-19 (T-1), 2021-22 (T-4) ...
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2018-19 (T-1), 2021-22 (T-4) ...
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2018-19 (T-1), 2021-22 (T-4) ...
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (19 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2018-19 (T-1), 2021-22 (T-4) ...
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (6 components)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Inactive • 2019-20 (T-1), 2021-22 (T-4) ...
Loading map...
Showing 25 locations