19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (2 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity …

Inactive • 2022-23 (T-3), 2023-24 (T-4)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Active • 2021-22 (T-4), 2022-23 (T-3) ...
2.14 MW
Albion Road, Dartford, Kent, UK, DA1 5PZ (9 components)
• A 2.5MW New Build Battery Storage System
• A New Build 2.5MW Generation Battery Site
• A New Build Generation Battery Site
Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
1.07 MW
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (9 components)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
Inactive • 2021-22 (T-1), 2022-23 (T-1) ...
10.68 MW
Back Lane, Chesterfield, S44 5XQ (14 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2022-23 (T-1), 2022-23 (T-3) ...
11.16 MW
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (12 components)

Battery Energy Storage System

Inactive • 2019-20 (T-1), 2020-21 (T-1) ...
6.24 MW
Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
• A 20MW New Build Battery Storage site
• A 29.5MW New Build Battery Storage site
Inactive • 2022-23 (T-3), 2023-24 (T-4)
Bolney Substation, Wineham Lane, Bolney, Haywards Heath, BN5 9AW (1 component)

49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation

Inactive • 2023-24 (T-4)
Boots, DD8 3BS (9 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2021-22 (T-4), 2022-23 (T-3) ...
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (16 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2022-23 (T-3), 2022-23 (T-4) ...
10.35 MW
Brinksway, Stockport, SK3 0BY (2 components)

A Battery Energy Storage System

Inactive • 2022-23 (T-3), 2023-24 (T-4)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (16 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2022-23 (T-3), 2022-23 (T-4) ...
4.27 MW
Chickerell substation, Weymouth, Dorset, DT4 9WW (2 components)

49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.

Inactive • 2023-24 (T-4)
10.20 MW
Crossways, Greenhithe, DA9 9BB (3 components)
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
• A Battery Energy Storage System.
Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System
Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (10 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (18 components)
• A new Build Generating Storage CMU
• Existing Generating Storage CMU
Inactive • 2021-22 (T-4), 2022-23 (T-1) ...
10.68 MW
66.82 MW
Indian Queens Substation, St Dennis, St Austell, PL26 8BY (1 component)

49.9 MW of Lithium Ion battery storage and power conversion system on a compound at Indian Queens Substation.

Inactive • 2023-24 (T-4)
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (7 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2018-19 (T-1), 2021-22 (T-4) ...
Johnson Street, Leigh, M46 0RB (5 components)

A Battery Energy Storage System

Inactive • 2022-23 (T-3), 2023-24 (T-4)
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (16 components)
• 49.900MW Battery Energy Storage System
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
Inactive • 2020-21 (T-1), 2021-22 (T-1) ...
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (18 components)
• Battery Energy Storage System located at Minety
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
Inactive • 2020-21 (T-1), 2021-22 (T-1) ...
12.33 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (24 components)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Active • 2023-24 (T-1), 2023-24 (T-4) ...
15.21 MW
Loading map...