43 unique locations (518 components) - Page 1 of 2

Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (20 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
55.97 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (16 components)
• Battery storage plant
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
50.58 MW
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (5 components)
• New build one-hour duration storage to replace diesel plant
• One-hour duration Battery Storage Plant.
Active • 2024-25 (T-1), 2023-24 (T-1)
11.64 MW
Barton Hill Way, Torquay, TQ2 8JG (10 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
41.28 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (6 components)

49.9MW Lithium-ion Energy Storage System

Active • 2026-27 (T-4), 2024-25 (T-1) ...
42.37 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (5 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.25 MW
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (5 components)

49.99MW Lithium-ion Energy Storage System

Active • 2024-25 (T-1), 2023-24 (T-1)
33.56 MW
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (13 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt

Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.93 MW
66.82 MW
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (13 components)

10MW of Battery Energy Storage Systems to be built.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
21.12 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (24 components)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
15.21 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)

CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.46 MW
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
• CMU ID 22GER1, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• Existing generating storage battery asset with CMU ID 24GER1
Active • 2025-26 (T-1), 2024-25 (T-1) ...
25.86 MW
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (8 components)

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
51.54 MW
Land at Weirs Drove, Cambridge, CB25 0BP (11 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.03 MW
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (10 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset

Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.10 MW
Land North Of Actrees Solar Farm Heathfield Alkington Gloucestershire GL13 9PP (3 components)

new build battery storage asset 49.900MW/49.900MWh one hour duration

Active • 2025-26 (T-4), 2024-25 (T-1)
11.32 MW
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (18 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
51.54 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (14 components)

Battery Storage Plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
68.11 MW
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (38 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs

Active • 2025-26 (T-4), 2024-25 (T-1) ...
122.37 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (10 components)

Battery storage 40.000MW/40.000MWh one duration battery new build

Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.66 MW