Storage (Duration 1h)

45 unique locations (778 components) - Page 1 of 2

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (68 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (13 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2022-23 (T-3), 2022-23 (T-4) ...
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (22 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2022-23 (T-1), 2022-23 (T-3) ...
66.68 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (29 components)
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
Active • 2023-24 (T-4), 2024-25 (T-1) ...
36.89 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2019-20 (T-1), 2021-22 (T-1) ...
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (6 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Active • 2021-22 (T-1), 2024-25 (T-4)
14.00 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (15 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
12.88 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (16 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2023-24 (T-4), 2024-25 (T-4) ...
20.07 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (24 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Active • 2021-22 (T-4), 2022-23 (T-1) ...
5.32 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (20 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2023-24 (T-1), 2023-24 (T-4) ...
7.42 MW
Russell Farm, Hursley, Winchester SO21 2UZ (15 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2022-23 (T-3), 2022-23 (T-4) ...
Redcoat Lane, Kirkstall, LS4 2AL (1 component)

100MW storage unit

Active • 2024-25 (T-4)
24.77 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (15 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2023-24 (T-1), 2023-24 (T-4) ...
71.09 MW
Plot B at Severn Road Avonmouth BS10 7SE (16 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Active • 2022-23 (T-1), 2024-25 (T-1) ...
7.74 MW
Millstream, Maidenhead Road, Windsor, SL45GD (4 components)

Battery storage unit

Active • 2021-22 (T-1), 2024-25 (T-4)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (23 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
4.50 MW
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (9 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …

Active • 2021-22 (T-1), 2021-22 (T-4) ...
1.07 MW
Maidenhead Road, Windsor, SL4 5GD (15 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2019-20 (T-1), 2021-22 (T-1) ...
2.04 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (19 components)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
8.43 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
243.40 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (6 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 50MW New Build Battery Storage site
Active • 2022-23 (T-3), 2023-24 (T-1) ...
31.39 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (17 components)
• 17.315 MW installed capacity Battery Storage facility
• 19.6 MW Battery Storage facility
• 19.6 MW installed capacity Battery Storage facility with proven DSR capacity 19.083
Active • 2022-23 (T-4), 2023-24 (T-4) ...
4.68 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2021-22 (T-1), 2024-25 (T-4) ...
12.74 MW
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (7 components)

New build storage facility

Active • 2021-22 (T-4), 2022-23 (T-4) ...