Storage (Duration 1h)

13 unique locations (146 components)

Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (14 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
34.61 MW
Dairy Lane Westhamnett Chichester PO20 2BG (8 components)

4MW battery co-located with a solar farm

Active • 2024-25 (T-4), 2025-26 (T-4) ...
1.51 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
2.67 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2025-26 (T-4), 2026-27 (T-4) ...
41.79 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)

CMU comprising of battery storage and associated plant

Active • 2024-25 (T-1), 2025-26 (T-4) ...
50.46 MW
Land North of Clayhill Farm, Westoning MK45 5JD (8 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
0.30 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
243.40 MW
Plot B at Severn Road Avonmouth BS10 7SE (16 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Active • 2022-23 (T-1), 2024-25 (T-1) ...
7.74 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (2 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
Active • 2025-26 (T-4), 2028-29 (T-4)
26.22 MW
Royle Barn Road, Rochdale, OL11 3DX (2 components)

Battery Energy Storage Site

Active • 2025-26 (T-1), 2025-26 (T-4)
16.49 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (16 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2023-24 (T-4), 2024-25 (T-4) ...
20.07 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (14 components)
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS
• BATTERY ENERGY STORAGE SYSTEM
Active • 2023-24 (T-1), 2024-25 (T-1) ...
44.43 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (15 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
12.88 MW