Storage (Duration 1h)

52 unique locations (574 components) - Page 1 of 3

Welkin Road, Bredbury, SK6 2BH (4 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2022-23 (T-3), 2023-24 (T-4) ...
7.79 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (29 components)
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
Active • 2023-24 (T-4), 2024-25 (T-1) ...
36.89 MW
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (6 components)

1.200MW BESS

Active • 2023-24 (T-1), 2026-27 (T-4) ...
1.03 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (15 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
12.88 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (14 components)
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS
• BATTERY ENERGY STORAGE SYSTEM
Active • 2023-24 (T-1), 2024-25 (T-1) ...
44.43 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (16 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active • 2023-24 (T-4), 2024-25 (T-4) ...
20.07 MW
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (5 components)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Active • 2023-24 (T-1), 2026-27 (T-4)
4.06 MW
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (1 component)

30.000MW standalone battery energy storage project

Active • 2026-27 (T-4)
3.54 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (20 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2023-24 (T-1), 2023-24 (T-4) ...
7.42 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (15 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2023-24 (T-1), 2023-24 (T-4) ...
71.09 MW
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (9 components)
• 50MW/50MWh one hour battery
• 50MW/50MWh one hour battery storage
Active • 2023-24 (T-1), 2024-25 (T-1) ...
52.76 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (12 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt

Active • 2022-23 (T-1), 2023-24 (T-1) ...
7.40 MW
Newchurch Road, Bacup, Lancashire, OL13 0BL (9 components)

Battery Storage

Active • 2023-24 (T-1), 2024-25 (T-1) ...
6.61 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (5 components)

Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

Active • 2026-27 (T-4), 2027-28 (T-4) ...
0.26 MW
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (2 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant

Active • 2026-27 (T-4)
7.09 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (19 components)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
8.43 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
243.40 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2021-22 (T-1), 2024-25 (T-4) ...
12.74 MW
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (18 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
Active • 2023-24 (T-1), 2023-24 (T-4) ...
51.54 MW
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP (2 components)

30MW/30MWh one hour battery storage asset located near BURWB1 asset

Active • 2026-27 (T-4)
7.09 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (12 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
Active • 2023-24 (T-4), 2024-25 (T-4) ...
6.28 MW
Land North of Clayhill Farm, Westoning MK45 5JD (8 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
0.30 MW