Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

2 unique locations (9 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (6 components)
• battery storage unit (2)
• New build battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nurse2 +3 more SO16
Active • 2025-26 (T-1), 2024-25 (T-1) ...
3.34 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (3 components)
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection (2)
• battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nursling SO16
Active • 2028-29 (T-4), 2023-24 (T-4) ...
0.63 MW
Loading map...
Showing 2 locations