Storage (Duration 1h)

4 unique locations (5 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 OX44
Inactive • 2021-22 (T-1)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2021-22 (T-1)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 Not Prequalified ME10
Inactive • 2020-21 (T-1)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (2 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...