227 unique locations (962 components) - Page 1 of 10

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (3)

Storage Storage (Duration 1h) GHEB2 A1 Limited New Build Generating CMU Pikelaw Place Pikelaw Place +2 more Not Prequalified WN8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD New Build Generating CMU Minety North Storage Minety North Storage 009 +6 more SN16
Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.86 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.65 MW
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
10.31 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (7 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (3)

Storage (Duration 1h) Storage (Duration 1.5h) FEEDER GRID STORAGE LIMITED New Build Generating CMU Feeder Road Feeder Road +2 more BS2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.35 MW
Airdrie WWTW, Sheepford, Cambroe, North Lanarkshire, ML5 4PZ (1 component)

45MW/45MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU AIRDRIE Not Prequalified ML5
Active • 2026-27 (T-4)
5.32 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant (2)
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Arreton Valley Nusery, Hale Common, Arreton, Newport, Isle of Wight, PO30 3AR (1 component)

The CMU component will have a connection capacity of 2.52MW. BYD Battery

Active • 2027-28 (T-4)
0.20 MW
Back Lane, Chesterfield, S44 5XQ (8 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) ARL 027 LIMITED ARL 027 LIMITED New Build Generating CMU Back Lane Back Lane +2 more S44
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.72 MW
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration Battery Storage Plant.
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT01 BATT01 SA11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.32 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (TORQUAY) LIMITED New Build Generating CMU Barton Hill Torquay +4 more TQ2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.74 MW
Basing Road, Basingstoke, RG24 7AN (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Storage (Duration 1h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.14 MW
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Reciprocating engines Storage (Duration 1h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Belvedere A Belvedere B Not Prequalified MK17
Active • 2025-26 (T-4)
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
• Battery Energy storage linked to solar farm (2)
• Solar farm
Solar Photovoltaic Storage (Duration 1h) WARRINGTON RENEWABLES (HULL) LIMITED New Build Generating CMU BILTON FARM BILTON FARM HU11
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.45 MW
Blacklaw Windfarm, North Lanarkshire, ML2 9PJ (1 component)

1 x 75MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
8.86 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (1B) +1 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bonnybridge WWTW, Larbert Rd, Bonnybridge, Stirling, FK5 0NP (1 component)

60MW/60MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU BONNYBRIDGE Not Prequalified FK5
Active • 2026-27 (T-4)
7.09 MW
Boscar Grange Farm York YO61 3NQ (4 components)

Battery Energy Storage system operating alongside solar farm (3)

Storage (Duration 1h) WARRINGTON RENEWABLES (YORK) LTD Existing Generating CMU BOSCAR GRANGE Rejected YO61
Active • 2025-26 (T-1), 2023-24 (T-1) ...
6.19 MW
Boscar Grange Farm York YO61 3NQ (1 component)

Battery Energy Storage system operating alongside solar farm

Storage (Duration 1h) WARRINGTON RENEWABLES (YORK) LTD Existing Generating CMU BOSCAR GRANGE Rejected YO61
Active • 2024-25 (T-4)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Storage Storage (Duration 1h) GHEB2 B1 LIMITED New Build Generating CMU Breach Farm Breach Farm +3 more DE12
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Brindley Close, Cheney Manor, Swindon, SN2 2YW (1 component)

12MW Battery Storage located at Brindley Close in Swindon

Storage (Duration 1h) Zenobe Brindley Limited New Build Generating CMU Brindley IFM SN2
Active • 2024-25 (T-4)
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Battery Storage Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.11 MW
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component)

Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU BRLR Redhouse KY1
Active • 2028-29 (T-4)
1.05 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)

Battery Storage Station (2)

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Brodsworth Storage Brodsworth Storage Not Prequalified DN6
Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Loading map...
Showing 25 locations