Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

217 unique locations (1927 components) - Page 2 of 9

Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (3 components)

Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the …

Active • 2028-29 (T-4)
0.11 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (14 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Inactive •
Capenhurst Lane Cheshire CH66 2NT (1 component)

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

Inactive •
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (16 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Inactive •
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (11 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Inactive •
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (18 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Inactive •
Coity Road, Bridgend, CF31 1NN (1 component)

New Build CMU comprising of battery storage and associated plant

Inactive •
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (14 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
34.61 MW
Crossways, Greenhithe, DA9 9BB (3 components)
Inactive •
Dairy Lane Westhamnett Chichester PO20 2BG (8 components)

4MW battery co-located with a solar farm

Active • 2024-25 (T-4), 2025-26 (T-4) ...
1.51 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (125 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Inactive •
Doncaster Power 16MW Ltd, Balby Carr Bank, J3 Business Park, Doncaster, DN4 8DE (1 component)

Battery Storage system with a duration of 1 hour

Inactive •
Dougliehill WWTW, Port Glasgow, Inverclyde, PA15 2PB (1 component)

49MW/49MWh BESS

Inactive •
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
2.67 MW
Duncombe Road, Girlington, Bradford, BD8 9AL (1 component)

New build one-hour duration storage to replace diesel plant

Inactive •
East to Sundon NG Substation Chalton Luton LU4 9UQ (1 component)

30.000 MW standalone battery energy storage project

Inactive •
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (5 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Active • 2024-25 (T-1), 2025-26 (T-1) ...
8.25 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (7 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Inactive •
Ferrymuir Farm, Cupar, KY15 5RW (4 components)

49.900MW one-hour duration battery energy storage facility.

Inactive •
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (1 component)

CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the …

Inactive •
Loading map...
Showing 25 locations