Storage (Duration 1h)

171 unique locations (1465 components) - Page 3 of 7

Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (8 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
Active • 2025-26 (T-4), 2023-24 (T-1) ...
22.08 MW
Nunhide Lane Theale Berkshire RG31 7SD (4 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (12 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt

Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.40 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (11 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
Active • 2025-26 (T-4), 2024-25 (T-1) ...
16.58 MW
Newchurch Road, Bacup, Lancashire, OL13 0BL (9 components)

Battery Storage

Active • 2026-27 (T-4), 2025-26 (T-1) ...
6.61 MW
Netherlands Way, Kiln Lane Industrial Estate, Starlingborough, UK, DN41 8DF (4 components)
• A 20MW New Build Battery Storage Site
• A 40MW New Build Battery Storage Site
Inactive • 2022-23 (T-4)
Millstream, Maidenhead Road, Windsor, SL45GD (4 components)

Battery storage unit

Active • 2024-25 (T-4), 2021-22 (T-1)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (23 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.50 MW
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (9 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
1.07 MW
Maidenhead Road, Windsor, SL4 5GD (15 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.04 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (5 components)

Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.26 MW
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (3 components)

10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (2 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant

Active • 2026-27 (T-4)
7.09 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (19 components)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.43 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
243.40 MW
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (10 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building.
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
Active • 2025-26 (T-4), 2022-23 (T-1) ...
7.74 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (10 components)

Battery storage 40.000MW/40.000MWh one duration battery new build

Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.66 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (6 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 50MW New Build Battery Storage site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
31.39 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (17 components)
• 17.315 MW installed capacity Battery Storage facility
• 19.6 MW Battery Storage facility
• 19.6 MW installed capacity Battery Storage facility with proven DSR capacity 19.083
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.68 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.74 MW
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
• The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
• The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines and will have export capacity of 20.000MW.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (38 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs

Active • 2025-26 (T-4), 2024-25 (T-1) ...
122.37 MW
Loading map...
Showing 25 locations