Storage (Duration 1h)

227 unique locations (962 components) - Page 4 of 10

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (2 components)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
Storage (Duration 1h) SCOTTISHPOWER RENEWABLES (UK) LIMITED New Build Generating CMU Harestanes Harestanes DG11
Active • 2025-26 (T-4), 2023-24 (T-1)
9.30 MW
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Hawthorne Road Hawthorne Road New Build Generating CMU +1 more Not Prequalified L20
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Heatherywood Road, Kirkcaldy KY1 3NW (2 components)

1hr duration battery storage project. (2)

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU South Redhouse KY1
Active • 2025-26 (T-4), 2022-23 (T-1)
Heatherywood Road, Kirkcaldy, KY1 3NW (2 components)

1hr Duration battery storage project. (2)

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU SRHA05 KY1
Active • 2027-28 (T-4), 2026-27 (T-4)
2.27 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more ST10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration battery storage project.
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT09 BATT09 NE29
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.42 MW
High Middlefield Farm, Durham Road, Thorpe Thewles, TS21 3LS. (2 components)

Battery Storage Plant (2)

Storage Storage (Duration 1h) NORTON STORAGE LIMITED New Build Generating CMU Norton Storage 024 Norton Storage 024 TS21
Active • 2025-26 (T-4), 2021-22 (T-4)
18.76 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more RG27
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build two-hour duration battery storage (2)
• New build one-hour duration storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.98 MW
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (4 components)

10MW of Battery Energy Storage Systems to be built. (3)

Storage (Duration 1h) DONCASTER POWER (10MW) LIMITED New Build Generating CMU DONC01 DN4
Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.99 MW
Kirkhaw Lane, Ferrybridge, WF11 8RD (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) VOX ENERGY LIMITED New Build Generating CMU Ferrybridge Not Prequalified WF11
Active • 2025-26 (T-4)
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (2 components)

1.200 MW battery storage (2)

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU WF11
Active • 2027-28 (T-4), 2026-27 (T-4)
0.14 MW
Laighpark WWTW, Abercorn St, Paisley, PA3 4DF (1 component)

50MW/50MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU LAIGHPARK Not Prequalified PA3
Active • 2026-27 (T-4)
5.91 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (6 components)
• battery storage unit (2)
• New build battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nurse2 +3 more SO16
Active • 2025-26 (T-1), 2024-25 (T-1) ...
3.34 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (3 components)
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection (2)
• battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nursling SO16
Active • 2028-29 (T-4), 2023-24 (T-4) ...
0.63 MW
LAND AT DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB (Nearest Postcode: SS11 8UA). (9 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 3h) DOLLYMANS STORAGE LIMITED New Build Generating CMU Dollymans Storage Dollymans Storage +4 more SS11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
28.86 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (7 components)

Gas Peaking Reciprocating Engine (3)

Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines Dollymans Power Limited New Build Generating CMU Dollymans Power 016 Dollymans Power 039 +3 more SS11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.46 MW
Land at former East Midlands Electricity Depot, Hawkins Lane, Burton upon Trent, DE14 1DB (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting 25MW for a 1 hour duration installed on designated land within a compound at Burton upon trent

Storage (Duration 1h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Burton Not Prequalified DE14
Active • 2025-26 (T-4)
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (7 components)

CMU comprising of battery storage and associated plant (3)

Storage (Duration 1h) CONRAD (FLITWICK) LIMITED Existing Generating CMU Flitwick Flitwick +3 more MK45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.77 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (2 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. (2)

Storage (Duration 1h) NORTHWOLD SOLAR FARM LIMITED New Build Generating CMU Northwold Solar Farm BESS IP26
Active • 2028-29 (T-4), 2025-26 (T-1)
1.81 MW
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, Scotland, ML2 0EF, United Kingdom (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Storage (Duration 1h) Zenobe Wishaw Limited New Build Generating CMU Wishaw Wishaw Not Prequalified ML2
Active • 2024-25 (T-4)
Loading map...
Showing 25 locations