Storage (Duration 1h)

90 unique locations (277 components) - Page 4 of 4

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Potmans Lane, Battle, TN33 9BL (6 components)

A Battery Energy Storage System (2)

Storage (Duration 1h) BRK 002 Limited New Build Generating CMU Potmans Lane A Potmans Lane B +1 more Not Prequalified TN33
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Storage (Duration 1h) HC ESS4 LIMITED New Build Generating CMU Longridge 3 Longridge 3 +1 more PR2
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (5 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Braintree Electric Forecourt +2 more CM77
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (3)

Storage Storage (Duration 1h) SpectrumReserve6 Ltd. New Build Generating CMU Spitfire Way Battery Storage Facility Spitfire Way Battery Storage Facility Not Prequalified FK3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (1 component)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Storage (Duration 1h) STEVENAGE ELECTRIC FORECOURT LTD New Build Generating CMU Stevenage Electric Forecourt Rejected SG1
Inactive • 2023-24 (T-1)
1.12 MW
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)

Storage Storage (Duration 1h) E.ON UK CHP LIMITED New Build Generating CMU Stevens Croft Battery Stevens Croft Battery Conditional DG11
Inactive • 2022-23 (T-4), 2021-22 (T-4)
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (4 components)

Storage facility (3)

Storage Storage (Duration 1h) IRE 001 LIMITED New Build Generating CMU KEYDT1 2MW storage KEYDT2 18MW storage +1 more PL2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (1 component)

Storage facility

Storage (Duration 1h) IRE 001 Limited New Build Generating CMU Ernesettle Lane PL5
Inactive • 2022-23 (T-1)
Sub station Percival Lane Runcorn Cheshire WA7 4DS (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

Storage (Duration 1h) SIGBAT F LIMITED New Build Generating CMU UKER75 UKER77 WA7
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (3)

Storage Storage (Duration 1h) KIWI POWER LTD Existing Generating CMU KPB001 KPB001 PL6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (1 component)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Storage (Duration 1h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Not Prequalified SL9
Inactive • 2021-22 (T-1)
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
• A 50MW New Build Battery Storage site (2)
• Existing 50MW Battery Storage site
Storage (Duration 1h) HC ESS6 LIMITED New Build Generating CMU Wickham Market 3 Wickham Market 3 +1 more IP13
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component)

New build one-hour duration storage to replace diesel plant

Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT02 SA1
Inactive • 2023-24 (T-1)
3.35 MW
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)

Storage Storage (Duration 1h) Reliagen Electric Ltd New Build Generating CMU Staines Battery Storage Facility Staines Battery Storage Facility Conditional TW18
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (5 components)

10MW battery energy storage facility at Upton Lane, Rownhams (3)

Storage Battery Storage Storage (Duration 1h) GBSL NURSLING LIMITED New Build Generating CMU GBSL Nursling GBSL Nursling +1 more Conditional SO16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 15 locations