Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

171 unique locations (1465 components) - Page 4 of 7

Land South of Main Road, Bilton, Hull, HU11 4DZ (4 components)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Land south of Halesfield 13, Telford, TF7 4PL (2 components)

5MW of Lithium Ion battery storage and power conversion systems.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land on the West Side of Blandford Road, Poole, BH16 6AB (3 components)

A 25MW New Build Battery Storage site

Inactive • 2023-24 (T-4), 2022-23 (T-3)
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (14 components)

Battery Storage Plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
68.11 MW
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (4 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (3 components)

The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (18 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
51.54 MW
land off Lower Farm, Itchington, South Glos. BS35 3TH. (1 component)

A 49.400 MW / 49.400 MWh battery energy storage system located in land off Lower Farm, Itchington, South Glos. BS35 3TH.

Active • 2025-26 (T-4)
9.86 MW
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP (2 components)

30MW/30MWh one hour battery storage asset located near BURWB1 asset

Active • 2026-27 (T-4)
7.09 MW
Land North of Oxford Road, Gerrards Cross, SL9 8DT (2 components)

20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (7 components)

New build storage facility

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land North of Clayhill Farm, Westoning, MK45 5JD (12 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.28 MW
Land North of Clayhill Farm, Westoning MK45 5JD (8 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.30 MW
Land North Of Actrees Solar Farm Heathfield Alkington Gloucestershire GL13 9PP (3 components)

new build battery storage asset 49.900MW/49.900MWh one hour duration

Active • 2025-26 (T-4), 2024-25 (T-1)
11.32 MW
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (10 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset

Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.10 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
36.26 MW
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TB, UK (2 components)

The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Inactive • 2022-23 (T-4)
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (3 components)

40 MW/40MWh BESS

Inactive • 2023-24 (T-1)
14.88 MW
Land at West Road, Trafford Park, M41 7SW (8 components)
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
• Battery Storage Station
Active • 2026-27 (T-4), 2025-26 (T-1) ...
11.10 MW
Land at Weirs Drove, Cambridge, CB25 0BP (11 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.03 MW
Land at Traston Road, Newport, NP19 4PW (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport

Active • 2025-26 (T-4)
3.99 MW
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (8 components)

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
51.54 MW
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
• CMU ID 22GER1, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• Existing generating storage battery asset with CMU ID 24GER1
Active • 2025-26 (T-1), 2024-25 (T-1) ...
25.86 MW
Loading map...
Showing 25 locations