Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

227 unique locations (962 components) - Page 5 of 10

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (2)
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Solar Photovoltaic Storage (Duration 1h) PORTH WEN SOLAR LIMITED New Build Generating CMU North Anglesey Battery Storage Project North Anglesey Battery Storage Project +5 more Not Prequalified LL66
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.02 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
• A 7.5MW Tesla Battery Energy Storage System (2)
• Tesla Battery Energy Storage System
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY HB LIMITED Existing Generating CMU HOLES BAY HOLESBAY +4 more BH15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.32 MW
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (4 components)
• CMU ID 22GER4, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• Existing generating storage battery asset with CMU ID 24GER1
Storage (Duration 1h) FIELD GERRARDS CROSS LTD New Build Generating CMU Field Gerrards Cross Field Gerrards Cross +2 more SL9
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.65 MW
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (4 components)

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA. (3)

Storage (Duration 1h) TOLLGATE ENERGY STORAGE LIMITED New Build Generating CMU TOL001 TOL001 AL4
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.37 MW
Land at Traston Road, Newport, NP19 4PW (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport

Storage (Duration 1h) EL ASSET CO. 1 LIMITED New Build Generating CMU Newport Not Prequalified NP19
Active • 2025-26 (T-4)
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)

49.900MW/49.900MWh battery storage asset, 1 hour duration (3)

Storage (Duration 1h) CARE POWER (BURWELL 1) LIMITED New Build Generating CMU BURWB1 Burwell Battery Storage Facility CB25
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.84 MW
Land at West Road, Trafford Park, M41 7SW (7 components)

Battery Storage Station (3)

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Taylor Road Storage Taylor Road Storage +2 more M41
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.12 MW
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (3 components)

40 MW/40MWh BESS (3)

Storage (Duration 1h) MALDON BESS LIMITED New Build Generating CMU MALDON MALDON +1 more CM9
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.98 MW
Land next to Capenhurst substation, Ledsham, Ellesmere Port, CH66 2HD (1 component)

49.9MW Battery Storage facility located at Capenhurst GSP

Storage (Duration 1h) Zenobe Capenhurst Limited New Build Generating CMU Capenhurst CH66
Active • 2024-25 (T-4)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (3 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU) (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
Storage (Duration 1h) Storage (Duration 2h) FP LUX SCURF DYKE SOLAR LIMITED New Build Generating CMU Scurf Dyke Solar Limited Scurf Dyke Solar Limited YO25
Active • 2025-26 (T-1), 2024-25 (T-1) ...
12.03 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (2 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Storage (Duration 1h) Storage (Duration 2h) FP LUX SCURF DYKE SOLAR LIMITED New Build Generating CMU Scurf Dyke Solar Limited Scurf Dyke Solar Limited YO25
Active • 2027-28 (T-4), 2026-27 (T-4)
6.68 MW
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.91 MW
Land North Of Actrees Solar Farm Heathfield Alkington Gloucestershire GL13 9PP (2 components)

new build battery storage asset 49.900MW/49.900MWh one hour duration (2)

Active • 2025-26 (T-4), 2024-25 (T-1)
5.66 MW
Land North of Clayhill Farm, Westoning MK45 5JD (5 components)

Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more MK45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (7 components)

6.000MW of storage located at Westoning (3)

DSR Storage (Duration 1h) CLAYHILL SOLAR LIMITED Existing Generating CMU Clayhill MK45
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.11 MW
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)

New build storage facility (3)

Storage Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED New Build Generating CMU South Redhouse South Redhouse +1 more KY1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (MIDSOMER) LIMITED CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Midsomer Norton Midsomer Norton +3 more BA3
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.74 MW
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP (1 component)

30MW/30MWh one hour battery storage asset located near BURWB1 asset

Active • 2026-27 (T-4)
3.54 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Atherton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 hour battery storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.29 MW
Land off Dunsinane Avenue, Dunsinmore Industrial Estate, Dundee, Scotland, DD2 3QF (3 components)
• 49MW Lithium-ion Energy Storage System (2)
• 49.9MW Lithium-ion Energy Storage System
Storage (Duration 1h) SUSI EELPOWER DUNSINANE LIMITED New Build Generating CMU LYND21 LYND21 DD2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.28 MW
land off Lower Farm, Itchington, South Glos. BS35 3TH. (1 component)

A 49.400 MW / 49.400 MWh battery energy storage system located in land off Lower Farm, Itchington, South Glos. BS35 3TH.

Storage (Duration 1h) IRON ACTON GREEN LIMITED New Build Generating CMU LARKS GREEN BS35
Active • 2025-26 (T-4)
Land off, Old School, Lane Hereford, HR4 9BP (3 components)
• A 13MW New Build Battery Storage site
• A 6MW New Build CHP site
• A New Build Battery Storage site
Storage (Duration 1h) Combined Heat and Power (CHP) NORIKER PERSEVERANCE LTD New Build Generating CMU Perseverance Battery 1 Perseverance Battery 2 +1 more Not Prequalified HR4
Active • 2026-27 (T-4), 2024-25 (T-4)
7.13 MW
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated land within a compound at Wood Farm
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich A Norwich B +1 more Not Prequalified NR14
Active • 2027-28 (T-4), 2025-26 (T-4)
10.77 MW
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA. (2)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
Storage Storage (Duration 1h) CUXTON ENERGY STORAGE LIMITED New Build Generating CMU CUX001 Cuxton Battery Storage Facility +2 more ME2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.37 MW
Loading map...
Showing 25 locations