Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

317 unique locations (1239 components) - Page 5 of 13

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Heatherywood Road, Kirkcaldy KY1 3NW (2 components)

1hr duration battery storage project. (2)

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU South Redhouse KY1
Active • 2025-26 (T-4), 2022-23 (T-1)
Heatherywood Road, Kirkcaldy, KY1 3NW (2 components)

1hr Duration battery storage project. (2)

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU SRHA05 KY1
Active • 2027-28 (T-4), 2026-27 (T-4)
2.27 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more ST10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration battery storage project.
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT09 BATT09 NE29
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.42 MW
High Middlefield Farm, Durham Road, Thorpe Thewles, TS21 3LS. (2 components)

Battery Storage Plant (2)

Storage Storage (Duration 1h) NORTON STORAGE LIMITED New Build Generating CMU Norton Storage 024 Norton Storage 024 TS21
Active • 2025-26 (T-4), 2021-22 (T-4)
18.76 MW
Hulley Road Macclesfield Cheshire SK10 2LP (1 component)

20.000 MW of battery storage located at Macclesfield

Storage (Duration 1h) Hulley Road Energy Storage Limited New Build Generating CMU Hulley Road SK10
Inactive • 2022-23 (T-4)
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more RG27
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Indian Queens Substation, St Dennis, St Austell, PL26 8BY (1 component)

49.9 MW of Lithium Ion battery storage and power conversion system on a compound at Indian Queens Substation.

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified PL26
Inactive • 2023-24 (T-4)
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Storage Storage (Duration 1h) Zenobe Wishaw Limited New Build Generating CMU Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Not Prequalified KY11
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build two-hour duration battery storage (2)
• New build one-hour duration storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.98 MW
J3 Business Park Balby Carr End Doncaster DN4 8DE (2 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Storage Storage (Duration 1h) Limejump Virtual 5 Limited New Build Generating CMU Doncaster Balby Doncaster Balby DN4
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Johnson Street, Leigh, M46 0RB (4 components)

A Battery Energy Storage System (2)

Storage (Duration 1h) AVE 017 Limited New Build Generating CMU Johnson Street A Johnson Street B Not Prequalified M46
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (4 components)

10MW of Battery Energy Storage Systems to be built. (3)

Storage (Duration 1h) DONCASTER POWER (10MW) LIMITED New Build Generating CMU DONC01 DN4
Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.99 MW
Kirkhaw Lane, Ferrybridge, WF11 8RD (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) VOX ENERGY LIMITED New Build Generating CMU Ferrybridge Not Prequalified WF11
Active • 2025-26 (T-4)
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (2 components)

1.200 MW battery storage (2)

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU WF11
Active • 2027-28 (T-4), 2026-27 (T-4)
0.14 MW
Laighpark WWTW, Abercorn St, Paisley, PA3 4DF (1 component)

50MW/50MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU LAIGHPARK Not Prequalified PA3
Active • 2026-27 (T-4)
5.91 MW
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (5 components)
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire (2)
• 49.900MW Battery Energy Storage System
Storage (Duration 1h) LOWER MINETY ENERGY LIMITED New Build Generating CMU LMES01 LMES01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 component)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage (Duration 1h) Lower Minety Energy Limited New Build Generating CMU Lower Minety Storage Conditional SN16
Inactive • 2022-23 (T-4)
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU Minety Storage Minety Storage Conditional SN16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (5 components)
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services. (2)
• Battery Energy Storage System located at Minety
Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU MBSS01 MBSS01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (6 components)
• battery storage unit (2)
• New build battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nurse2 +3 more SO16
Active • 2025-26 (T-1), 2024-25 (T-1) ...
3.34 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (3 components)
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection (2)
• battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nursling SO16
Active • 2028-29 (T-4), 2023-24 (T-4) ...
0.63 MW
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Conditional FY5
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations