Storage (Duration 1h)
218 unique locations (1932 components) - Page 6 of 9
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (13 components)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (5 components)
The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (17 components)
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (6 components)
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (6 components)
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET (1 component)
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (10 components)
Battery storage 40.000MW/40.000MWh one duration battery new build
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (10 components)
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
Lascar Works, Tanpits Road, Bury BL9 5BY (1 component)
Lascar Works, Tanpits Road, Bury, BL9 5BY (19 components)
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (2 components)
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (3 components)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (13 components)
Battery Storage Plant (3)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (12 components)
Battery Storage Plant
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (5 components)
Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …
Low Dyke, Calthwaite, Penrith, CA11 9PS (5 components)
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Maidenhead Road, Windsor, SL4 5GD (15 components)
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (9 components)
The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …