Storage (Duration 1h)
334 unique locations (1426 components) - Page 6 of 14
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 component) Geocoding Needed
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components) Geocoding Needed
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (5 components) Geocoding Needed
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (6 components)
Land adjacent to Nursling Substation, Station Road, Nursling, Southampton, SO16 0AH (9 components) Geocoding Needed
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components) Geocoding Needed
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components) Geocoding Needed
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (2 components) Geocoding Needed
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components) Geocoding Needed
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components) Geocoding Needed
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (1 component)
A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring …
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (3 components) Geocoding Needed
Land At Brook Farm, Off Church Hill Road, North Of Burstall (in Close Proximity To The Bramford Substation Off Bullen Lane), Ipswich Nearest IP8 4LB (3 components)
battery storage asset 49.900MW/49.900MWh (3)
Land At Brook Farm, Off Church Hill Road, North Of Burstall (in Close Proximity To The Bramford Substation Off Bullen Lane), Ipswich, Nearest IP8 4LB (4 components) Geocoding Needed
battery storage asset 49.900MW/49.900MWh
Land at Burnley Road Simonstone BB12 7ND (4 components) Geocoding Needed
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Land at Claredown Farm, Hickford Hill, Belchamp St Paul, Sudbury, Essex, CO10 7DW (6 components) Geocoding Needed
LAND AT DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB (Nearest Postcode: SS11 8UA). (9 components) Geocoding Needed
Battery Storage Plant
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (7 components) Geocoding Needed
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components) Geocoding Needed
A Battery Energy Storage System.
Land at former East Midlands Electricity Depot, Hawkins Lane, Burton upon Trent, DE14 1DB (1 component) Geocoding Needed
Grid-scale energy storage system based on Lithium Ion, capable of exporting 25MW for a 1 hour duration installed on designated land within a compound at Burton upon trent
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (7 components) Geocoding Needed
CMU comprising of battery storage and associated plant
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (2 components) Geocoding Needed
7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, Scotland, ML2 0EF, United Kingdom (2 components) Geocoding Needed
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV