Storage (Duration 1h)

334 unique locations (1426 components) - Page 6 of 14

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 component) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage (Duration 1h) Lower Minety Energy Limited New Build Generating CMU Lower Minety Storage Conditional SN16
Inactive • 2022-23 (T-4)
14.67 MW
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU Minety Storage Minety Storage Conditional SN16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.46 MW
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (5 components) Geocoding Needed
• Battery Energy Storage System located at Minety
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU MBSS01 MBSS01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
37.16 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (6 components)
• battery storage unit (2)
• New build battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nurse2 +3 more SO16
Active • 2025-26 (T-1), 2024-25 (T-1) ...
3.34 MW
Land adjacent to Nursling Substation, Station Road, Nursling, Southampton, SO16 0AH (9 components) Geocoding Needed
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
38.86 MW
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components) Geocoding Needed

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
34.18 MW
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Conditional FY5
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.46 MW
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (2 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Rejected FY5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
20.85 MW
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) WEST MELTON BATTERY STORAGE LIMITED New Build Generating CMU West Melton Storage West Melton Storage Conditional S63
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.46 MW
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) FISHCROSS BATTERY STORAGE LIMITED New Build Generating CMU Bankhead Storage Bankhead Storage +3 more Conditional FK10
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
34.25 MW
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (1 component)

A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring …

Storage (Duration 1h) ENERGY STORE 6 LTD New Build Generating CMU York Energy Centre Conditional YO61
Inactive • 2019-20 (T-1)
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (3 components) Geocoding Needed
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
15.88 MW
Land at Burnley Road Simonstone BB12 7ND (4 components) Geocoding Needed

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage (Duration 1h) SIGBAT B LIMITED New Build Generating CMU UKER30 UKER76 +2 more Rejected BB12
Inactive • 2019-20 (T-1)
13.68 MW
Land at Claredown Farm, Hickford Hill, Belchamp St Paul, Sudbury, Essex, CO10 7DW (6 components) Geocoding Needed
• 20 MW of DSR
• 20MW Battery Storage Facility located in Sudbury, Essex.
• 3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
42.65 MW
LAND AT DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB (Nearest Postcode: SS11 8UA). (9 components) Geocoding Needed

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 3h) DOLLYMANS STORAGE LIMITED New Build Generating CMU Dollymans Storage Dollymans Storage +4 more SS11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
162.73 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (7 components) Geocoding Needed
• Battery Storage Plant
• Battery storage plant
• Gas Peaking Reciprocating Engine
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines Dollymans Power Limited New Build Generating CMU Dollymans Power 016 Dollymans Power 039 +3 more SS11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
191.99 MW
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components) Geocoding Needed

A Battery Energy Storage System.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
41.91 MW
Land at former East Midlands Electricity Depot, Hawkins Lane, Burton upon Trent, DE14 1DB (1 component) Geocoding Needed

Grid-scale energy storage system based on Lithium Ion, capable of exporting 25MW for a 1 hour duration installed on designated land within a compound at Burton upon trent

Storage (Duration 1h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Burton Not Prequalified DE14
Active • 2025-26 (T-4)
4.99 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (7 components) Geocoding Needed

CMU comprising of battery storage and associated plant

Storage (Duration 1h) CONRAD (FLITWICK) LIMITED Existing Generating CMU Flitwick Flitwick +3 more MK45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.94 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (2 components) Geocoding Needed

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.

Storage (Duration 1h) NORTHWOLD SOLAR FARM LIMITED New Build Generating CMU Northwold Solar Farm BESS IP26
Active • 2028-29 (T-4), 2025-26 (T-1)
1.81 MW
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, Scotland, ML2 0EF, United Kingdom (2 components) Geocoding Needed

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Storage (Duration 1h) Zenobe Wishaw Limited New Build Generating CMU Wishaw Wishaw Not Prequalified ML2
Active • 2024-25 (T-4)
12.36 MW
Land at Rhyd y Groes, Rhosgoch, Anglesey, Wales, LL66 0AT (7 components) Geocoding Needed
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
52.32 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components) Geocoding Needed
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
20.00 MW
Loading map...
Showing 25 locations