LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (8 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
• CMU ID 22GER1, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• Existing generating storage battery asset with CMU ID 24GER1
Active • 2025-26 (T-1), 2024-25 (T-1) ...
25.86 MW
Land at Sterte Avenue West, Poole, BH15 2AL (24 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.01 MW
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (6 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (6 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.

Active • 2028-29 (T-4), 2025-26 (T-1)
3.62 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)

CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.46 MW
47.60 MW
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (1 component)

3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately

Inactive • 2022-23 (T-4)
Land at Burnley Road Simonstone BB12 7ND (16 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2019-20 (T-1)
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (6 components)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (19 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (4 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
10.20 MW
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (18 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (24 components)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
15.21 MW
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (18 components)
• Battery Energy Storage System located at Minety
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
12.33 MW
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (7 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 component)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4)
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (16 components)
• 49.900MW Battery Energy Storage System
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Laighpark WWTW, Abercorn St, Paisley, PA3 4DF (1 component)

50MW/50MWh BESS

Active • 2026-27 (T-4)
5.91 MW
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (8 components)

1.200 MW battery storage

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.62 MW
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (13 components)

10MW of Battery Energy Storage Systems to be built.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
21.12 MW