Storage (Duration 1h)

334 unique locations (1426 components) - Page 7 of 14

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components) Geocoding Needed
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
• Tesla Battery Energy Storage System
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY HB LIMITED Existing Generating CMU HOLES BAY HOLESBAY +4 more BH15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.69 MW
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (4 components) Geocoding Needed
• CMU ID 22GER4, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• Existing generating storage battery asset with CMU ID 24GER1
Storage (Duration 1h) FIELD GERRARDS CROSS LTD New Build Generating CMU Field Gerrards Cross Field Gerrards Cross +2 more SL9
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.65 MW
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components) Geocoding Needed
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Storage Storage (Duration 1h) RNA-Energy Ltd New Build Generating CMU Tollgate Battery Storage Facility Tollgate Battery Storage Facility +1 more Conditional AL4
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
44.12 MW
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (4 components) Geocoding Needed

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.

Storage (Duration 1h) TOLLGATE ENERGY STORAGE LIMITED New Build Generating CMU TOL001 TOL001 AL4
Active • 2026-27 (T-4), 2025-26 (T-4) ...
24.14 MW
Land at Traston Road, Newport NP19 4PW (1 component) Geocoding Needed

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Storage (Duration 1h) FPC INDUSTRY & ENTERPRISE 2 LIMITED New Build Generating CMU Traston Road Conditional NP19
Inactive • 2022-23 (T-4)
5.80 MW
Land at Traston Road, Newport, NP19 4PW (1 component) Geocoding Needed

Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport

Storage (Duration 1h) EL ASSET CO. 1 LIMITED New Build Generating CMU Newport Not Prequalified NP19
Active • 2025-26 (T-4)
3.99 MW
Land at Weirs Drove, Cambridge, CB25 0BP (5 components) Geocoding Needed
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
Storage (Duration 1h) CARE POWER (BURWELL 1) LIMITED New Build Generating CMU BURWB1 Burwell Battery Storage Facility CB25
Active • 2025-26 (T-4), 2024-25 (T-1) ...
36.65 MW
Land at West Road, Trafford Park, M41 7SW (7 components) Geocoding Needed
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
• Battery Storage Station
Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Taylor Road Storage Taylor Road Storage +2 more M41
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.82 MW
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (3 components) Geocoding Needed

40 MW/40MWh BESS

Storage (Duration 1h) MALDON BESS LIMITED New Build Generating CMU MALDON MALDON +1 more CM9
Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.96 MW
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TB, UK (1 component) Geocoding Needed

The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Aura Power Storage Solutions Ltd New Build Generating CMU Feeder Road Battery Storage Facility Conditional BS2
Inactive • 2022-23 (T-4)
5.88 MW
Land next to Capenhurst substation, Ledsham, Ellesmere Port, CH66 2HD (1 component) Geocoding Needed

49.9MW Battery Storage facility located at Capenhurst GSP

Storage (Duration 1h) Zenobe Capenhurst Limited New Build Generating CMU Capenhurst CH66
Active • 2024-25 (T-4)
12.36 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (3 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU) (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
Storage (Duration 1h) Storage (Duration 2h) FP LUX SCURF DYKE SOLAR LIMITED New Build Generating CMU Scurf Dyke Solar Limited Scurf Dyke Solar Limited YO25
Active • 2025-26 (T-1), 2024-25 (T-1) ...
12.03 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application), Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components) Geocoding Needed
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.71 MW
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components) Geocoding Needed

New build battery storage 50.000MW/50.000MWh one hour duration asset

Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.06 MW
Land North Of Actrees Solar Farm Heathfield Alkington Gloucestershire GL13 9PP (2 components) Geocoding Needed

new build battery storage asset 49.900MW/49.900MWh one hour duration

Active • 2025-26 (T-4), 2024-25 (T-1)
9.56 MW
Land North of Clayhill Farm, Westoning MK45 5JD (5 components) Geocoding Needed
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more MK45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.23 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (11 components) Geocoding Needed
• 6 MW Battery Storage facility located at Westoning.
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
DSR Storage Storage (Duration 1h) CLAYHILL SOLAR LIMITED Existing Generating CMU Clayhill MK45
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.24 MW
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components) Geocoding Needed

New build storage facility

Storage Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED New Build Generating CMU South Redhouse South Redhouse +1 more KY1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.55 MW
Land North of Oxford Road, Gerrards Cross, SL9 8DT (2 components) Geocoding Needed

20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road

Storage (Duration 1h) PINSTONE ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified SL9
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.18 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components) Geocoding Needed
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (MIDSOMER) LIMITED CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Midsomer Norton Midsomer Norton +3 more BA3
Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.46 MW
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP (1 component) Geocoding Needed

30MW/30MWh one hour battery storage asset located near BURWB1 asset

Active • 2026-27 (T-4)
3.54 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components) Geocoding Needed
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Atherton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 hour battery storage system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.28 MW
Land off Carseview Road, Forfar, DD8 3BS (7 components) Geocoding Needed
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
20.96 MW
Land off Dunsinane Avenue, Dunsinmore Industrial Estate, Dundee, Scotland, DD2 3QF (3 components) Geocoding Needed
• 49.9MW Lithium-ion Energy Storage System
• 49MW Lithium-ion Energy Storage System
Storage (Duration 1h) SUSI EELPOWER DUNSINANE LIMITED New Build Generating CMU LYND21 LYND21 DD2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
34.09 MW
land off Lower Farm, Itchington, South Glos. BS35 3TH. (1 component) Geocoding Needed

A 49.400 MW / 49.400 MWh battery energy storage system located in land off Lower Farm, Itchington, South Glos. BS35 3TH.

Storage (Duration 1h) IRON ACTON GREEN LIMITED New Build Generating CMU LARKS GREEN BS35
Active • 2025-26 (T-4)
9.86 MW
Loading map...
Showing 25 locations