Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

171 unique locations (1465 components) - Page 7 of 7

Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (14 components)
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS
• BATTERY ENERGY STORAGE SYSTEM
Active • 2026-27 (T-4), 2025-26 (T-1) ...
44.43 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (15 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.88 MW
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (6 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Active • 2024-25 (T-4), 2021-22 (T-1)
14.00 MW
The Manorway, Stanford-leHope, SS17 9LL (2 components)

A Battery Energy Storage System

Active • 2025-26 (T-4)
5.49 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (6 components)

1.200MW BESS

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.03 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG (1 component)

New build one-hour duration storage to replace diesel plant

Active • 2025-26 (T-4)
3.59 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (4 components)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
10.04 MW
Traston Road, Newport, NP19 4PW (1 component)

A 18MW distribution connected energy storage plant comprising of batteries

Active • 2025-26 (T-4)
3.59 MW
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (8 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse.

Active • 2025-26 (T-1), 2024-25 (T-1) ...
41.63 MW
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (3 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (29 components)
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
36.89 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (22 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
66.68 MW
Welkin Road, Bredbury, SK6 2BH (4 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.79 MW
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (6 components)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of …

Active • 2025-26 (T-1), 2023-24 (T-1)
29.38 MW
West Thorpe, Willoughby-on-the-wold, LE12 6TD (4 components)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
11.16 MW
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (13 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Yalberton Road, Paignton, TQ4 7QL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
2.99 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (68 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 21 locations