Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

334 unique locations (1426 components) - Page 8 of 14

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Land off, Old School, Lane Hereford, HR4 9BP (3 components) Geocoding Needed
• A 13MW New Build Battery Storage site
• A 6MW New Build CHP site
• A New Build Battery Storage site
Storage (Duration 1h) Combined Heat and Power (CHP) NORIKER PERSEVERANCE LTD New Build Generating CMU Perseverance Battery 1 Perseverance Battery 2 +1 more HR4
Active • 2026-27 (T-4), 2024-25 (T-4)
10.35 MW
Land off Stoke Lane, Norwich, NR14 8QD (3 components) Geocoding Needed
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated land within a compound at Wood Farm
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich A Norwich B +1 more Not Prequalified NR14
Active • 2027-28 (T-4), 2025-26 (T-4)
30.73 MW
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components) Geocoding Needed
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
Storage Storage (Duration 1h) CUXTON ENERGY STORAGE LIMITED New Build Generating CMU CUX001 Cuxton Battery Storage Facility +2 more ME2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
66.24 MW
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (2 components) Geocoding Needed

The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage Storage (Duration 1h) NORTH EAST GRID STORAGE ONE LTD New Build Generating CMU Saltend Battery Storage Facility Saltend Battery Storage Facility Conditional HU12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
13.17 MW
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN., See map uploaded. (4 components) Geocoding Needed

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
12.11 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (11 components) Geocoding Needed

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 4h) ENDERBY STORAGE LIMITED New Build Generating CMU Enderby Storage 019 Enderby Storage 042 +6 more LE19
Active • 2025-26 (T-4), 2024-25 (T-4) ...
144.62 MW
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components) Geocoding Needed

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.

Storage Storage (Duration 1h) SOUTH WEST GRID STORAGE TWO LTD New Build Generating CMU Iron Acton Battery Storage Facility Iron Acton Battery Storage Facility Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4)
23.60 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (6 components) Geocoding Needed

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage +3 more M33
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.01 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (5 components) Geocoding Needed

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage 017 +1 more M33
Active • 2024-25 (T-4), 2023-24 (T-4) ...
68.56 MW
Land on the West Side of Blandford Road, Poole, BH16 6AB (2 components) Geocoding Needed

A 25MW New Build Battery Storage site

Storage (Duration 1h) Noriker Bond Ltd New Build Generating CMU Blandford 1 BH16
Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.22 MW
Land south of Halesfield 13, Telford, TF7 4PL (2 components) Geocoding Needed

5MW of Lithium Ion battery storage and power conversion systems.

Storage (Duration 1h) HALESFIELD ENERGY CENTER LTD New Build Generating CMU Not Prequalified TF7
Inactive • 2023-24 (T-4), 2022-23 (T-3)
1.05 MW
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.

Storage (Duration 1h) ENERGY STORE 4 LTD New Build Generating CMU Hull Energy Centre Conditional HU11
Inactive • 2019-20 (T-1)
Land South of Main Road, Bilton, Hull, HU11 4DZ (2 components) Geocoding Needed
• New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
• New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
Inactive • 2022-23 (T-4), 2019-20 (T-1)
6.68 MW
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (4 components) Geocoding Needed

Standalone Battery Storage Asset

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) NATIVE RIVER LTD New Build Generating CMU Native River Native River +1 more CH66
Active • 2026-27 (T-4), 2025-26 (T-4) ...
49.35 MW
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (16 components) Geocoding Needed

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs

Storage (Duration 1h) Zenobe Capenhurst Limited New Build Generating CMU Capenhurst Capenhurst +1 more CH1
Active • 2025-26 (T-4), 2024-25 (T-1) ...
52.86 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Storage Storage (Duration 1h) GRIDRESERVE LTD New Build Generating CMU Byers Brae Battery Storage Facility Byers Brae Battery Storage Facility +1 more EH54
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components) Geocoding Needed

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
24.42 MW
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components) Geocoding Needed
• The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
• The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines and will have export capacity of 20.000MW.
Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Gas) NORTH EAST GRID STORAGE TWO LTD New Build Generating CMU Bransholme Battery Storage Facility Bransholme Facility Conditional HU7
Inactive • 2022-23 (T-4), 2021-22 (T-4)
24.84 MW
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components) Geocoding Needed

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.

Storage Storage (Duration 1h) SOUTH EAST GRID STORAGE TWO LTD New Build Generating CMU Rayleigh Battery Storage Facility Rayleigh Battery Storage Facility SS6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.37 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2021-22 (T-1)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2020-21 (T-1)
Land To The South Of Kemsley Substation, Ypres Drive, Sittingbourne, Kent, ME10 2FB (9 components) Geocoding Needed
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.26 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components) Geocoding Needed
• 17.315 MW installed capacity Battery Storage facility
• 17.615 MW installed capacity Battery Storage facility
• 19.791 MW installed capacity Battery Storage facility
DSR Storage (Duration 1h) SUSI EELPOWER ROCK FARM LIMITED Existing Generating CMU ROCK18 ROCK18 +7 more SY8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
96.46 MW
Loading map...
Showing 25 locations