Storage (Duration 2h)

50 unique locations (453 components) - Page 1 of 2

Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (16 components)
• Battery storage plant
• Existing generating battery storage unit.
Active • 2022-23 (T-1), 2023-24 (T-1) ...
50.58 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (6 components)
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Active • 2023-24 (T-1), 2024-25 (T-1) ...
73.66 MW
Barton Hill Way, Torquay, TQ2 8JG (10 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Active • 2023-24 (T-1), 2024-25 (T-1) ...
41.28 MW
Blandford Road, Poole, BH16 6AB (7 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2023-24 (T-1), 2024-25 (T-1) ...
41.55 MW
Bristol Avenue, Blackpool, FY2 0JF (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2023-24 (T-1), 2024-25 (T-1) ...
33.36 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (9 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2022-23 (T-3), 2022-23 (T-4) ...
75.39 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (18 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2022-23 (T-3), 2022-23 (T-4) ...
91.05 MW
Clay Tye Road, Upminister, RM14 3PL (13 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Active • 2022-23 (T-3), 2022-23 (T-4) ...
100.45 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (5 components)

New Build Battery Storage Facility

Active • 2023-24 (T-1), 2025-26 (T-1)
80.51 MW
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (4 components)

A new build 20MW battery energy storage system

Inactive • 2023-24 (T-1)
18.39 MW
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire,BD15 0BZ (6 components)

New build battery storage.

Active • 2023-24 (T-1), 2024-25 (T-1) ...
87.41 MW
66.82 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (8 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Active • 2022-23 (T-4), 2023-24 (T-1) ...
91.06 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (11 components)
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Active • 2022-23 (T-3), 2022-23 (T-4) ...
13.52 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (6 components)

This is a 20MW battery storage facility connected at 33kV.

Inactive • 2022-23 (T-1), 2023-24 (T-1)
14.81 MW
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (5 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
Active • 2023-24 (T-1), 2024-25 (T-1)
66.80 MW
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (10 components)

Battery energy storage unit

Active • 2023-24 (T-1), 2025-26 (T-1) ...
2.68 MW
Land at Sterte Avenue West, Poole, BH15 2AL (24 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2022-23 (T-4), 2023-24 (T-1) ...
11.01 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
49.98 MW
Land east of A981, Fraserburgh, Aberdeenshire (5 components)

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh

Active • 2023-24 (T-1), 2026-27 (T-4)
18.67 MW
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
33.32 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2023-24 (T-1), 2025-26 (T-1) ...
36.26 MW