Storage (Duration 2h)

6 unique locations (124 components)

AB51 (98 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
140.87 MW
Barton Hill Way, Torquay, TQ2 8JG (9 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
25.38 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.29 MW
St Philips Energy Storage Facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2024-25 (T-1)
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.73 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (7 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
25.99 MW
Loading map...
Showing 6 locations