Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

73 unique locations (307 components) - Page 1 of 3

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
• Existing CMU comprising of battery storage and associated plant (2)
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (WINCHESTER) LIMITED New Build Generating CMU Winchester Winchester +2 more SO21
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.26 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Whaddon Farm BESS Whaddon Farm Solar Park BA14
Active • 2027-28 (T-4), 2024-25 (T-1)
4.42 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Reciprocating engines Storage (Duration 2h) STOR 108 LTD HAMILTON LANE POWER LIMITED New Build Generating CMU Hamilton Hamilton +3 more OL4
Active • 2026-27 (T-4), 2024-25 (T-1) ...
25.00 MW
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon (3)

Storage (Duration 2h) Zenobe Brindley Limited New Build Generating CMU Brindley_21 Brindley_21 +1 more SN2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
7.16 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW4, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Storage (Duration 2h) FIELD NEWPORT LTD New Build Generating CMU Field Newport Field Newport +2 more NP19
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.04 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
32.54 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) CORPOWER LIMITED New Build Generating CMU Corpower Corpower +3 more Not Prequalified SS17
Active • 2025-26 (T-4), 2024-25 (T-1)
8.21 MW
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
12.94 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (SWINDON) LIMITED New Build Generating CMU Swindon Swindon +2 more SN3
Active • 2027-28 (T-4), 2025-26 (T-1) ...
10.59 MW
St Philips Energy Storage Facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (ST PHILIPS) LIMITED New Build Generating CMU St Philips BS2
Active • 2024-25 (T-1)
1.46 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Waterswallows BESS Waterswallows BESS SK17
Active • 2025-26 (T-1), 2024-25 (T-1)
6.34 MW
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (8 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (2)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
Storage Storage (Duration 2h) Storage (Duration 0.5h) NEVENDON ENERGY STORAGE LTD New Build Generating CMU Nevendon Battery Storage Nevendon Battery Storage +2 more SS14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.46 MW
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

Storage (Duration 2h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU 7RES31 7RES31 DN20
Active • 2028-29 (T-4), 2025-26 (T-4) ...
21.09 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
• The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
• The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
Storage (Duration 2h) SSE BATTERY SALISBURY LIMITED New Build Generating CMU Salisbury BESS Salisbury BESS SP2
Active • 2025-26 (T-4), 2024-25 (T-1)
9.98 MW
Rusholme Grange, Drax, YO8 8PW (3 components)
• New build 35MW Battery Energy Storage System (2)
• Lithium-ion Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY RH LTD New Build Generating CMU HRHL21 Rusholme BESS +1 more YO8
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.89 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (6 components) Geocoding Needed
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station. (2)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Storage Storage (Duration 2h) VATTENFALL WIND POWER LTD New Build Generating CMU Battery@Ray Battery@Ray +2 more
Active • 2024-25 (T-1), 2024-25 (T-4) ...
11.94 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
42.89 MW
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (5 components)

Battery storage plant (3)

Storage (Duration 1h) Storage (Duration 2h) COUPAR LIMITED New Build Generating CMU Coupar 20MW 2 hour BESS Coupar 21MW 2 hour BESS +3 more PH13
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.04 MW
8.16 MW
Pillswood Phase 2, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (1 component)

LFP Battery Energy Storage facility

Storage (Duration 2h) HARMONY (PW) 2 LIMITED Existing Generating CMU PILLSWOOD 2 HU16
Active • 2024-25 (T-1)
10.88 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (2 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Storage (Duration 2h) HARMONY (PW) LIMITED Existing Generating CMU PILLSWOOD PILLSWOOD HU16
Active • 2024-25 (T-1), 2023-24 (T-1)
29.21 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Storage (Duration 2h) ECOTRICITY (SMART GRID) LIMITED New Build Generating CMU Alveston 10MW Battery Storage Alveston 10MW Battery Storage +1 more BS35
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.98 MW
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Lowfields Way, Lowfields Business Park, HX5 9DA (5 components)
• BATTERY STORAGE PLANT
• New build battery storage
• New build generating storage unit
Storage (Duration 2h) UK BATTERY STORAGE LTD GREENGRIDPOWER1 LTD New Build Generating CMU Elland Elland +2 more HX5
Active • 2028-29 (T-4), 2025-26 (T-4) ...
51.32 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (6 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM WEST STORAGE LIMITED New Build Generating CMU Melksham West Storage1 Melksham West Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.98 MW
Loading map...
Showing 25 locations