Storage (Duration 2h)

6 unique locations (244 components)

West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (23 components)
• CHP at a horticultural environment.
• CHP at horticultural site
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.83 MW
Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB (13 components)
• Existing CMU comprising of battery storage and associated plant
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
104.96 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Deansford Lane, DY10 4NB (15 components)
• A new build 11MW battery storage system
• Battery system installed at Emirates Stadium
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.54 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (35 components)
• A 7.5MW Tesla Battery Energy Storage System
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2098.53 MW